Signature(s)

Amount
€ 490,000,000
Countries
Sector(s)
Greece : € 490,000,000
Energy : € 490,000,000
Signature date(s)
17/12/2025 : € 50,000,000
26/01/2026 : € 202,000,000
23/12/2025 : € 238,000,000

Summary sheet

Release date
7 July 2025
Status
Reference
Signed | 17/12/2025
20250178
Project name
Promoter - financial intermediary
IPTO NORTH EAST AEGEAN INTERCONNECTION
INDEPENDENT POWER TRANSMISSION OPERATOR SA
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 490 million
EUR 1628 million
Location
Sector(s)
  • Energy - Electricity, gas, steam and air conditioning supply
Description
Objectives

The project will connect the island regions of Lemnos, Lesvos, Chios, Samos and Skyros to the mainland transmission grid through Nea Santa in Thrace to the north and Aliveri on Evia to the east. It will also link them to the Dodecanese islands grid via Mastichari on Kos to the south. The connection will primarily use 150 kV alternating current (AC) cable interconnectors and 150 kV gas-insulated substations (GIS).

The project supports the energy and climate policy objectives of the European Union and Greece. It will end the electrical isolation of the islands concerned and provide a more efficient, reliable and cleaner electricity supply compared with the current reliance on local diesel or heavy fuel oil power stations. It will also improve security of supply, increase capacity for connecting renewable energy sources in the region and foster economic development on the islands, particularly through tourism.

Additionality and Impact

The Project will interconnect the North-East Aegean Islands, which currently rely on polluting oil-based generation, to the Hellenic Electricity Transmission System. It will enable the development and integration of additional renewable capacity (onshore and offshore), delivering significant economic benefits through local and general impacts by addressing multiple market failures. The Project also supports regional development and cohesion.

The net benefits of the Project translate into a good economic profitability and broader social benefits. The good governance framework underpins overall good quality and results of the Project.

The Project is consistent with national and EU climate and energy goals and aligns with the REPowerEU objectives. The financing of this Project also contributes to the Bank's lending priority objectives on Climate Action, Environmental Sustainability, and Economic and Social Cohesion. The financing of the Project will contribute to the Bank's Energy Lending Policy themes on Securing the Enabling Infrastructure (energy networks).

The proposed operation meets the required funding needs of the Promoter, by providing an amortising loan with a long tenor and an adequate pre-amortisation period, together with a sizeable financing volume. The EIB loan is expected to further improve the Promoter's maturity profile as well as the diversification of its funding sources.

Environmental aspects
Procurement

Most of the project components fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The impacts that can be typically expected relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora (Habitats 92/43/EC and Birds 2009/147/EC Directives)

The EIB will require the promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
Under appraisal
Approved
Signed
12 December 2025
17 December 2025

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - IPTO NORTH EAST AEGEAN INTERCONNECTION
Publication Date
17 Dec 2025
Document language
Main Topic
Lending
Document Number
248837342
Document Focus
Environmental Information
Project Number
20250178
Sector(s)
Regions
Countries
Publicly available
Download now

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications