    Signature(s)

    Amount
    € 600,000,000
    Countries
    Sector(s)
    Greece : € 600,000,000
    Energy : € 600,000,000
    Signature date(s)
    5/02/2026 : € 600,000,000

    Summary sheet

    Release date
    7 July 2025
    Status
    Reference
    Signed | 05/02/2026
    20250177
    Project name
    Promoter - financial intermediary
    IPTO DODECANESE INTERCONNECTION
    INDEPENDENT POWER TRANSMISSION OPERATOR SA
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 1900 million
    EUR 2548 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    Description
    Objectives

    The project will facilitate the interconnection of the islands of Kos, Rhodes and Karpathos with the Hellenic Electricity Transmission System. More specifically, it will finance: - one overhead transmission line (Corinth), two converter stations (Corinth and Kos); - two High Voltage Direct Current submarine cables (Corinth to Kos), one Dedicated Metallic Return submarine cable (Corinth to Kos); - two fibre optic submarine cables (Kos to Naxos, and Kos to Syros); - two Gas Insulated Switchgear substations (Kos and Karpathos); - one Static Compensator (Rhodes); - four power and eight fibre optic submarine cables (Kos to Rhodes, and Rhodes to Karpathos); - works in or expansion of three existing Gas Insulated Switchgear substations (Rhodes and Corinth).

    The aim is to contribute to the energy and climate policy objectives of the European Union and Greece. The project is expected to eliminate the electrical isolation of the affected islands, ensure a more efficient, reliable, and clean electricity supply compared to the current reliance on local diesel or heavy fuel oil power stations, improve supply security, increase the capacity for integrating Renewable Energy Sources in the region, and contribute to the continued economic development of the islands, particularly through tourism.

    Additionality and Impact

    The Project will interconnect the Dodecanese islands, which currently rely on local diesel and Heavy Fuel Oil power generation, to the Hellenic Electricity Transmission System. It will enable the development and integration of additional renewable capacity, delivering significant economic benefits through local and general impacts by addressing multiple market failures. The Project also supports regional development and cohesion.


    The net benefits of the Project translate into a fair economic profitability and broader social benefits. The good governance framework underpins overall good quality and results of the Project.


    The Project is consistent with national and EU climate and energy goals and aligns with the REPowerEU objectives. The financing of this Project also contributes to the Bank's lending priority objectives on Climate Action, Environmental Sustainability, and Economic and Social Cohesion. The financing of the Project will contribute to the Bank's Energy Lending Policy themes on Securing the Enabling Infrastructure (energy networks).


    The proposed operation meets the required funding needs of the Promoter, by providing an amortising loan with a long tenor and an adequate pre-amortisation period, together with a sizeable financing volume. The EIB loan is expected to further improve the Promoter's maturity profile as well as the diversification of its funding sources.

    Environmental aspects
    Procurement

    The overhead transmission line in Corinth falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU). The combined environmental impact assessment for the overhead transmission line in Corinth, the two converter stations (Corinth and Kos), and the two submarine cables (Corinth to Kos) has been submitted to the Ministry of Environment and Energy for approval. The rest of the schemes fall under Category B of Law 4014/2011 and require Standard Environmental Commitments. The submarine cable between Rhodes and Karpathos requires a special ecological assessment in line with Law 4014/2011. All environmental permitting is expected to be obtained during appraisal. The impacts that can be typically expected relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance, and disturbances during construction, as well as the possible impacts on protected fauna and flora.

    The Promoter shall ensure that contracts for implementation of the project have been or will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Milestone
    Under appraisal
    Approved
    Signed
    19 November 2025
    5 February 2026

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - IPTO DODECANESE INTERCONNECTION - Μελέτη Περιβαλλοντικών Επιπτώσεων
    Publication Date
    15 Oct 2025
    Document language
    Main Topic
    Lending
    Document Number
    253180374
    Document Focus
    Environmental Information
    Project Number
    20250177
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - IPTO DODECANESE INTERCONNECTION
    Publication Date
    20 Nov 2025
    Document language
    Main Topic
    Lending
    Document Number
    248333013
    Document Focus
    Environmental Information
    Project Number
    20250177
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications