    € 200,000,000
    Countries
    Sector(s)
    Romania : € 200,000,000
    Energy : € 200,000,000
    Signature date(s)
    20/11/2024 : € 200,000,000

    Summary sheet

    Release date
    26 November 2024
    Status
    Reference
    Signed | 20/11/2024
    20230659
    Project name
    Promoter - financial intermediary
    DELGAZ ELECTRICITY DISTRIBUTION
    DELGAZ GRID SA
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 200 million
    EUR 629 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    Description
    Objectives

    The project consists in an investment programme in electricity distribution in Romania, covering the period 2024-2027. The programme includes investments in high, medium and low voltage networks, metering, as well as network automation. It includes elements of the CARMEN (Carpathian Modernisation of Energy Network) Project of Common Interest.

    The project is expected to modernise and expand the promoter's distribution network, by supporting its efficient operation, contributing to the integration of Renewable Energy Sources (RES), and catering for the connection of new customers.

    Additionality and Impact

    The programme comprises investments in the electricity distribution network in the north-eastern Romania over the period 2024-2027 and elements of the smart grids project CARMEN, which is a Project of Common Interest (PCI). The programme addresses the needs for the renewal of existing assets (based on an assessment of asset condition) and planned development, including modernisation and expansion, new connections, automation, metering. The programme contributes to maintaining or increasing security of supply. 100% of the programme will benefit Cohesion regions in Romania. Long tenor and flexible financing conditions (drawdown and repayment flexibility) provided by the Bank will help the Promoter achieve the investment objectives.

    Environmental aspects
    Procurement

    The investment programme comprises several electricity distribution schemes with voltages ranging from 0.4 kV up to 110 kV. Some of these schemes may fall under Annex II of Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU), which requires the competent national authority to determine the need for an EIA. Where, and if applicable, the requirements of Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC will be verified during appraisal. The programme schemes related to automation and metering are expected to have limited environmental impact. The environmental and social due diligence will follow the programme lending approach according to the EIB's procedures and standards. It will focus on the Promoter's capacity to implement the programme in line with the EIB environmental and social standards and requirements.

    The EIB will require the promoter to ensure that contracts for implementation of the project are tendered in accordance with the applicable EU procurement legislation, 2014/25/EU as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Milestone
    Under appraisal
    Approved
    Signed
    28 August 2024
    20 November 2024

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - DELGAZ ELECTRICITY DISTRIBUTION
    Publication Date
    11 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    190505960
    Document Focus
    Environmental Information
    Project Number
    20230659
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications