Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 236,000,000
    Countries
    Sector(s)
    Armenia : € 236,000,000
    Transport : € 236,000,000
    Signature date(s)
    12/11/2024 : € 236,000,000
    Other links

    Summary sheet

    Release date
    16 August 2024
    Status
    Reference
    Signed | 12/11/2024
    20230365
    Project name
    Promoter - financial intermediary
    ARMENIA SISIAN-KAJARAN ROAD PROJECT
    REPUBLIQUE D'ARMENIE
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 236 million
    EUR 1349 million
    Location
    Sector(s)
    Description
    Objectives

    The project will finance the construction of a 60 km-long single carriageway road link between Sisian and Kajaran in the southern and mountainous region of Syunik, divided into two sections and Bargushat tunnel, which is a key part of Armenia's North-South Highway.

    The aim is to address the market/network failure related to accessibility along the extended core trans-European network (TEN-T) road network. The new climate resilient road link will improve connectivity along the North-South transport corridor, by reducing travelling times, vehicle operating costs and road crashes while contributing to mitigate climate change.

    Additionality and Impact

    The project addresses the market/network failure related to accessibility along the extended Core TEN-T road network. The project is expected to improve connectivity along the North-South road corridor, by providing a new climate resilient road link that will contribute to climate change mitigation through reduced travel distance. The new link will reduce travel times, vehicle operating costs and road crashes.

    The EIB has been instrumental in the preparation stage of this flagship project, in close cooperation with EBRD (who managed an EU grant for Feasibility Study and ESIA), and in mobilising ADB co-financing.

    Environmental aspects
    Procurement

    An Environmental and Social Impact Assessment (ESIA) report with respect to the IFI standards has been prepared under EBRD support and included in the public consultation launched by EBRD in August 2023 for 120 days. The project crosses some national and internationally recognised protected areas and some natural and critical habitats, where potential impacts are anticipated due to project activities. Appropriate mitigation measures (avoidance, reduction, restoration) have been proposed to minimise the impacts to acceptable levels within the scope of the environmental and social impact assessment (ESIA). ESIA also proposes measures to achieve net gain for the two affected critical habitats. Further conservation measures are planned for the threatened species impacted, to ensure that the project does not result in any net loss. The ESIA concluded that the project does not jeopardise the integrity of the species and habitats nor it will compromise the viability of the critical habitats and/or habitats of high biodiversity value or their associated features at the scale of the Ecologically Appropriate Area of Analysis (or greater).

    The operation is considered a public sector operation for which the national procurement legal framework applies. As with other infrastructure projects the promoter manages all civil works, supply and supervision/technical assistance contracts related to the implementation of this project. These contracts will be tendered internationally according to the normal procedures and requirements for public works in Armenia. It is expected that the project works will be tendered in three lots (two road sections co-financed by EIB, one tunnel section). The procurement is expected to be delegated to EBRD, as lead financier, for the southern road section and to ADB, as lead financier, for the northern road section.

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Milestone
    Under appraisal
    Approved
    Signed
    16 October 2024
    12 November 2024
    Related documents

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Environmental and Social Action Plan (ESAP)
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232538481
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Annex 1 to ESIA report - Biodiversity Baseline
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232538962
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Environmental and Social Management Plan (ESMP)
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232573498
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Non Technical Summary
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232530623
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Stakeholder Engagement Plan (SEP) - ARMENIA SISIAN-KAJARAN ROAD PROJECT
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232537369
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Social Environment
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232523711
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Cumulative Impact Assessment
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232538374
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Biodiversity Action Plan
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232540001
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - ARMENIA SISIAN-KAJARAN ROAD PROJECT
    Publication Date
    24 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    227063318
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Physical Environment
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232526137
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Annex 2 to ESIA report - Critical Habitat Assessment
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232539729
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Project definition
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232525746
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Resettlement Framework
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232525354
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - ESIA Disclosure and Consultation report
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232526982
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Conclusions And Recommendations
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232536778
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Annex 3 to ESIA report - Appropriate Assessment
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232528899
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ARMENIA SISIAN-KAJARAN ROAD PROJECT - Biodiversity
    Publication Date
    1 Oct 2024
    Document language
    Main Topic
    Lending
    Document Number
    232545552
    Document Focus
    Environmental Information
    Project Number
    20230365
    Sector(s)
    Countries
    Publicly available
    Download now
    Link to source

    News & Stories

    Other links

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications