    Summary sheet

    Release date
    2 December 2024
    Status
    Reference
    Signed | 22/11/2024
    20230093
    Project name
    Promoter - financial intermediary
    NORTEGAS BIOMETHANE PRODUCTION PLANTS
    NORBIOGAS RENOVABLES SLU
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 80 million
    EUR 415 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    Description
    Objectives

    The Framework Loan will finance the construction and operation of a number of biomethane production plants in several regions in Spain over the period 2024-2028. The preliminary pipeline includes 34 greenfield projects for a capital expenditure of EUR 415m, at several degrees of maturity.

    The aim is to enable Nortegas Renovables to advance in the development of renewable gases from waste to be injected into the existing gas grid.

    Additionality and Impact

    The Project is in line with the InvestEU objective of developing the energy sector and sustainable bioeconomy.

    The Project consists of the construction and operation of several anaerobic digestion biogas units. The facilities will produce biogas and upgrade it into biomethane, which will then be injected into the natural gas grid. The plants will utilize agricultural residues, mainly livestock manure from surrounding farms, as well as minor stakes of organic by-products from agro-industry and vegetal residues to produce biomethane and organic fertilizers (digestate).

    The Project is fully aligned with key EU policies, namely the Green Deal and its Fit for 55 package, of achieving climate neutrality by 2050 and committing to cutting emissions by at least 55% by 2030. It also contributes to replacing fossil-based feedstock with renewable-based resources, while substantially contributing to reduction of (diffused) pollution from Agriculture, notably in terms of GHG emissions and groundwater potential pollution. In this sense, the Project is also aligned with the Global Methane Pledge (GMP).

    The Project contributes to the EIB PPG on "Sustainable Energy and Natural Resources", addressing in particular pollution abatement, renewable energies, circular economy and broader environmental issues. The operation contributes 100% to the horizontal objectives of CA&ES (CA Mitigation and Circular Economy).

    Based on the targeted pipeline of the operation, it is expected that a share of the operation will be located in Cohesion Regions, with a contribution in terms of CAPEX of 36% to less developed regions and 43% to Transition regions. In addition, it will contribute with a 4% in Just Transition regions. The Project will contribute to strengthening the economy in transition and less developed regions, offering quality employment in rural areas of Castilla y León, Castilla la Mancha, Extremadura, and other Autonomic Communities severely affected by rural depopulation.

    The Project is eligible under article 309 (c) common interest and partially point (a) projects for developing less-developed regions of the TFEU.

    The Bank's financial contribution is considered excellent and valuable to the client, considering the long tenor of EIB's loan and the diversification of its financier base, being the first transaction entered by Nortegas with an International Financial Institution (IFI). An excellent financial contribution is achieved due to the customised terms, such as the longer availability period or length of financing. Additionally, by providing debt at attractive conditions, the EIB facilitates the company's transition towards decarbonisation.

    The Project would not have been carried out to the same extent by the EIB without the InvestEU support.

    Environmental aspects
    Procurement

    Compliance with the EU environmental legislation will be assessed during appraisal, particularly it will be assured that the feedstock strategy is effectively compliant with RedII provisions, Taxonomy Act and EIB requirements. For several plants, depending on the related regional regulations, environmental impact assessments (EIAs) might be needed, while several EIAs are ongoing (Autorización Ambiental Integrada).

    Procurement strategy will have to comply with EIB Guide to Procurement provisions. EIB will assess at appraisal stage the procurement regime of the promoter.

    Milestone
    Under appraisal
    Approved
    Signed
    27 May 2024
    22 November 2024

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - NORTEGAS BIOMETHANE PRODUCTION PLANTS
    Publication Date
    3 Dec 2024
    Document language
    Main Topic
    Lending
    Document Number
    181342106
    Document Focus
    Environmental Information
    Project Number
    20230093
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications