Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount (.*)
    € 39,725,000
    Countries
    Sector(s)
    Palestine* : € 39,725,000
    Water, sewerage : € 39,725,000
    Signature date(s)
    3/06/2025 : € 19,862,500
    10/01/2024 : € 19,862,500
    (*) Including a € 19,862,500 Investment Grants provided by the COMMISSION EUROPEENNE

    Summary sheet

    Release date
    27 September 2023
    Status
    Reference
    Signed | 10/01/2024
    20230080
    Project name
    Promoter - financial intermediary
    NORTHEAST RAMALLAH WASTEWATER
    PALESTINIAN WATER AUTHORITY - PALESTINIAN NATIONAL AUTHORITY
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 55 million
    EUR 59 million
    Location
    Sector(s)
    • Water, sewerage - Water supply; sewerage, waste management and remediation activities
    Description
    Objectives

    The project will enhance wastewater collection and treatment services in an area located northeast of Ramallah, in Palestine. In detail, it includes the following main components: (i) a new wastewater collection system for 14 villages/municipalities in the project area (ii) a new regional wastewater treatment plant in line with EU standards (iii) trunk lines leading to the wastewater treatment plant (iv) solar photovoltaic panels to contribute to the wastewater treatment plant energy needs (v) reuse scheme.

    The aim is to improve the current services, since less than 20% of the population in the project area is connected to a sewage collection system. In addition, even where sewage is collected, no treatment is applied, with wastewater being discharged to wadis or open channels, hence contaminating both surface/ground water as well as soil.

    Additionality and Impact

    The project foresees the provision of a wastewater collection and treatment system for northeast Ramallah, in Palestine. Investments in sanitation infrastructure generate positive externalities through avoided pollution of the environment, surface and ground water. Therefore, the operation will bring substantial benefits to the population residing in the project area in terms of: (i) increasing access to safely managed sanitation services; (ii) environmental protection and depollution; (iii) improving public health, by protecting surface/underground water quality and reducing pollution; (iv) climate action thanks to wastewater reuse and sustainable water resources management in the context of water scarcity and the possible generation of renewable energy from solar PVs; (v) broadly speaking, promoting sustainable economic development, by contributing to the improvement of economic prospects and livelihoods of farmers in the area. Addressing these externalities and the resulting market failures thus contributes to achieving the EU, EIB's and national objectives of environmental protection and natural resource efficiency. Additionally, the project supports various sustainable development goals, in particular, but not limited to, contributing to clean water and sanitation, good health and wellbeing, and clean and affordable energy.

    The long maturity of the EIB loan, its concessional financial terms with expected mobilization of a grant from the EU-Neighbourhood Investment Platform (EU NIP) are of high value to the Borrower and the project. Additionally, the long tenor, flexible terms of drawdowns adjusted to the needs of the project and advantageous financial terms will increase the financial flexibility and investment capacity. The Bank's contribution will therefore facilitate the completion of the project on favourable terms and in a timely manner.

    Environmental aspects
    Procurement

    The project will have a positive impact through: (i) increased access to safely managed sanitation services for the local population (ii) environmental protection and depollution adaptation (iii) reduction of greenhouse gas emissions through energy savings due to optimised, state-of-the-art wastewater treatment processes as well as solar energy (iii) adaptation to climate change impacts by potentially providing water for re-use in irrigation from the treated effluent and (iv) improved environmental and public health. Inside the EU, the project components would be categorised under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU as amended by the Directive 2014/52/EU. The compliance with principles of relevant environmental EU legislation and EIB Environmental & Social Standards as well as climate change aspects will be further examined during appraisal.

    The promoter (as an implementing agency) will have to follow the project procurement process according to the EIB's Guide to Procurement and the Palestinian Procurement Law.

    Under Global Europe NDICI guarantee

    Under EFSD+ Guarantee

    Milestone
    Under appraisal
    Approved
    Signed
    15 November 2023
    10 January 2024

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - NORTHEAST RAMALLAH WASTEWATER - Feasibility Study Report
    Publication Date
    28 Sep 2023
    Document language
    Main Topic
    Lending
    Document Number
    169428923
    Document Focus
    Environmental Information
    Project Number
    20230080
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - NORTHEAST RAMALLAH WASTEWATER
    Publication Date
    17 Nov 2023
    Document language
    Main Topic
    Lending
    Document Number
    171315622
    Document Focus
    Environmental Information
    Project Number
    20230080
    Sector(s)
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications