Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 499,008,085.37
    Countries
    Sector(s)
    The Netherlands : € 499,008,085.37
    Transport : € 499,008,085.37
    Signature date(s)
    9/12/2025 : € 20,689,318.95
    9/12/2025 : € 478,318,766.42

    Summary sheet

    Release date
    10 December 2025
    Status
    Reference
    Signed | 09/12/2025
    20180217
    Project name
    Promoter - financial intermediary
    VIA15 NETHERLANDS PPP
    KONINKRIJK DER NEDERLANDEN
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 499 million
    EUR 1633 million
    Location
    Sector(s)
    Description
    Objectives

    The ViA15 Project will increase the capacity and improve road safety of the Dutch motorway network in the vicinity of Arnhem. The project consists of: 1. Construction of a new 12km section extending the A15 from Ressen to the A12 2. Widening of the existing A15 between Valburg and Ressen 3. Widening of ~11km on the A12 between Duiven and Oud-Dijk The new 12km extension of the A15 will include a sunken section and bridges over existing infrastructure. On both motorways a number of junctions will be redesigned and reconstructed.

    The ViA15 project in the Netherlands is a missing link on the core TEN-T network. The project will increase the capacity and improve road safety of the Dutch motorway network in the Netherlands-Germany border area in the vicinity of the municipality of Arnhem. The project will also facilitate international traffic flows from the Rotterdam Port towards Germany / rest of Europe. The project consists of: 1. Construction of a new 12km section extending the A15 from Ressen to the A12 2. Widening of the existing A15 between Valburg and Ressen 3. Widening of ~11km on the A12 between Duiven and Oud-Dijk The new 12km extension of the A15 will include a sunken section and bridges over existing infrastructure. On both motorways a number of junctions will be redesigned and reconstructed. The promoter is the Dutch Ministry of Infrastructure and the Environment represented by Rijkswaterstaat.

    Environmental aspects
    Procurement

    The project falls under Annex I of the EIA Directive 2011/92/EU. During appraisal, the Services will review the ESIA process, and verify whether the Environmental Impact Statement ("MER") originally issued in 2008 has been amended as needed to address the comments received during the review period. The Bank will also review the progress on the appeals related to the project by the courts ("Raad van State"). The compliance of the project with the prescriptions of EIA Directive 2014/52/EU amending the EIA Directive 2011/92/EU, SEA Directive 2001/42/EC, Habitats Directive 92/43/EEC and Birds Directive 79/409/EEC will be reviewed at appraisal.

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been or shall be tendered in accordance with all the relevant applicable EU procurement legislation (Directives 2014/24/EU and 2007/66EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. Compliance with the EU and national regulations will be established during appraisal.

    Milestone
    Under appraisal
    Approved
    Signed
    10 September 2019
    9 December 2025

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - VIA15 NETHERLANDS PPP
    Publication Date
    12 Dec 2025
    Document language
    Main Topic
    Lending
    Document Number
    250441375
    Document Focus
    Environmental Information
    Project Number
    20180217
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Other links

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications