Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 100,000,000
    Countries
    Sector(s)
    Austria : € 100,000,000
    Transport : € 100,000,000
    Signature date(s)
    17/12/2018 : € 100,000,000

    Summary sheet

    Release date
    12 October 2018
    Status
    Reference
    Signed | 17/12/2018
    20170519
    Project name
    Promoter - financial intermediary
    OEBB MARCHEGGER OSTBAHN
    OEBB-INFRASTRUKTUR AG
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 100 million
    EUR 313 million
    Location
    Sector(s)
    Description
    Objectives

    The project consists of the modernisation and electrification of about 37.5 km of the current single track rail line between Wien-Stadlau and Marchegg, at the border between with Slovakia, which is currently used to its full capacity. The aim is to improve significantly the journey speed and reduce the bottleneck between Vienna and Bratislava and consequently, enhance the Austrian part of the Baltic-Adriatic corridor.

    The project route is part of the 65km long connection between Vienna and Bratislava main train stations, including a 27km long completely straight track section. The works, which started in 2017 and will be implemented by 2023, concern the entire railway network: improvements to stations, bridges, railway junctions, establishment of double track sections, construction of buildings and signaling and telecommunication installation.

    Environmental aspects
    Procurement

    The project is to be carried out within existing rights of way or on new alignment of twin track over short sections. The project falls under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and therefore be subject to screening. Taking into account the size of the project and the cumulative impacts of the planned works, the project has been subject to an EIA which has been approved by the Competent Authority (decision GZ. BMVIT-820.341/0014-IV/IVVS4/2015 from December 2015). The appraisal will review the decision.

    The EIB will require the Promoter to ensure that contracts for the implementation of the project have been or shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/25/EC) interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. The Bank is aware of one publication in the OJEU from September 2017 (2017/S 172-353002) for building works and one for supervisory work from February 2018 (2018/S 038-083895).

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - OEBB MARCHEGGER OSTBAHN
    Publication Date
    20 Dec 2018
    Document language
    Main Topic
    Lending
    Document Number
    84872824
    Document Focus
    Environmental Information
    Project Number
    20170519
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Other links

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications