    Summary sheet

    Release date
    4 October 2016
    Status
    Reference
    Signed | 15/12/2016
    20150778
    Project name
    Promoter - financial intermediary
    CEPS TRANSMISSION GRID II
    CEPS AS
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    CZK 3000 million (EUR 111 million)
    CZK 6000 million (EUR 222 million)
    Location
    Sector(s)
    Description
    Objectives

    Multi-component investment programme covering the period 2016-2020 aiming to reinforce the electricity transmission infrastructure of the Czech Republic

    The project is expected to enable the promoter to improve the safety of the system, support the efficient operation of the electricity market in central and eastern Europe and maintain the reliability and quality of electricity supply.

    Environmental aspects
    Procurement

    The project concerns electricity transmission schemes (overhead lines, new substations and works in existing facilities) some of which will fall under Annex I of the Environmental Impact Assessment (EIA) Directive and will have to undergo an obligatory environmental impact assessment, while most of the remainder will fall under Annex II, which requires the competent national authority to determine the need for an EIA. The main impact that can typically be expected for a project of this nature relate to visual impact, vegetation clearance, electromagnetic fields, noise nuisance, impact on flying vertebrates and disturbance during construction. Environmental and social (E&S) aspects will be reviewed during appraisal to ensure alignment with Bank E&S requirements.

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, (i.e. Directive 2014/25/EU or Directive 2004/17/EC where applicable, as well as Directives 89/665/EEC , 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - CEPS TRANSMISSION GRID II - Link to ESIA documentation
    Publication Date
    22 Nov 2016
    Document language
    Main Topic
    Lending
    Document Number
    71918117
    Document Focus
    Environmental Information
    Project Number
    20150778
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - CEPS TRANSMISSION GRID II
    Publication Date
    15 Dec 2016
    Document language
    Main Topic
    Lending
    Document Number
    68895061
    Document Focus
    Environmental Information
    Project Number
    20150778
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - CEPS TRANSMISSION GRID II
    Publication Date
    22 Dec 2022
    Document language
    Main Topic
    Lending
    Document Number
    164598725
    Document Focus
    Environmental Information
    Project Number
    20150778
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Other links

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications