Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 70,000,000
    Countries
    Sector(s)
    Iceland : € 70,000,000
    Energy : € 70,000,000
    Signature date(s)
    15/12/2016 : € 70,000,000

    Summary sheet

    Release date
    25 April 2016
    Status
    Reference
    Signed | 15/12/2016
    20150480
    Project name
    Promoter - financial intermediary
    REYKJAVIK ENERGY GEOTHERMAL
    ORKUVEITA REYKJAVIKUR
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 70 million
    EUR 144 million
    Location
    Sector(s)
    Description
    Objectives

    The project comprises extension works on two geothermal power plants outside Reykjavik and refurbishment of the district heating system and electricity distribution system in Reykjavik. The extensions at the power plants are done to sustain production levels by drilling additional wells and to meet environmental requirements by increasing re-injection. The district heating investments comprise some 30 km of new and renewed piping, pumps and tanks. The electricity distribution investments comprise some 30 km of new or renewed underground cables, one new medium-voltage substation, additional transformer capacity and a new SCADA-system. New meters to comply with EU directives are also implemented in both heat and electricity distribution.

    The project uses renewable geothermal energy to generate electricity in Iceland, predominantly to meet demand from the energy-intensive industrial facility. The project therefore supports EU and national policy to promote renewable energy. Moreover, the project will contribute to economic growth and diversification in a remote, less-developed region.

    Environmental aspects
    Procurement

    The main environmental risk relates to geological hazards (volcanic eruptions and earthquakes), while the main concerns are related to noise during construction and impact on a protected lava field and nature conservation area which the access road will cross. Additionally, the project will emit carbon dioxide and hydrogen sulphide. Mitigation measures in line with industry practice are proposed.

    Iceland, as a signatory to the European Economic Area (EEA) Agreement, has adopted EU procurement legislation. The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Non-Technical Summary (NTS) - REYKJAVIK ENERGY GEOTHERMAL - Hellisheidi Plant
    Publication Date
    9 Jun 2016
    Document language
    Main Topic
    Lending
    Document Number
    66937671
    Document Focus
    Environmental Information
    Project Number
    20150480
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - REYKJAVIK ENERGY GEOTHERMAL - Nesjavellir Plant
    Publication Date
    9 Jun 2016
    Document language
    Main Topic
    Lending
    Document Number
    66937779
    Document Focus
    Environmental Information
    Project Number
    20150480
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - REYKJAVIK ENERGY GEOTHERMAL
    Publication Date
    9 Jun 2016
    Document language
    Main Topic
    Lending
    Document Number
    66943013
    Document Focus
    Environmental Information
    Project Number
    20150480
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - REYKJAVIK ENERGY GEOTHERMAL
    Publication Date
    15 Dec 2020
    Document language
    Main Topic
    Lending
    Document Number
    134406789
    Document Focus
    Environmental Information
    Project Number
    20150480
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Other links

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications