Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 30,000,000
    Countries
    Sector(s)
    Austria : € 30,000,000
    Water, sewerage : € 10,500,000
    Energy : € 19,500,000
    Signature date(s)
    14/12/2017 : € 10,500,000
    14/12/2017 : € 19,500,000

    Summary sheet

    Release date
    12 May 2014
    Status
    Reference
    Signed | 14/12/2017
    20140216
    Project name
    Promoter - financial intermediary
    EFFICIENT UTILITY INFRASTRUCTURE KLAGENFURT
    STADTWERKE KLAGENFURT AG - The promoter is a local utility and in charge of operating and maintaining these networks.
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 30 million
    EUR 72 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    • Water, sewerage - Water supply; sewerage, waste management and remediation activities
    Description
    Objectives

    The project comprises the promoter’s investments from 2014 to 2018 in its existing district heat and water grids located in the city of Klagenfurt (Austria). Concerning the district heating component, investments are related to the refurbishment of the district heating system, its expansion to new clients, and a substantial change of heat supply. The latter comprises the following key measures and is expected to lead to a significant increase in renewable energy use (mainly cogeneration based): • Conversion of a large heavy fuel oil fired base load cogeneration plant in the city centre, that is at the end of its technical lifetime, into a 120 MWth natural gas fired plant and peak load boiler; • Installation of a new oil or gas fired reserve and peak load heating plant (presumably around 30 MWth) in the West of the city, including grid connection; and • Installation of a grid connection to a new biomass cogeneration plant (around 50 MWth) in the East of the city which will become the system’s base load heat supplier in future (the biomass cogeneration plant itself is outside the scope of this operation because it will be implemented by a third party based on a long term heat-offtake agreement with the promoter). The water related investments, mainly replacement of distribution pipes, will ensure the efficiency of the distribution system. Other investments in the water treatment system will ensure compliance with European Drinking water standards. The promoter also intends to undertake a cross-border project to reduce water losses in the transmission systems.

    The water related investments, mainly replacement of distribution pipes, will ensure the efficiency of the distribution system. Other investments in the water treatment system will ensure compliance with European Drinking water standards. The promoter also intends to undertake a cross-border project to reduce water losses in the transmission systems.

    Environmental aspects
    Procurement

    Due to the predominantly urban characteristics of the project, environmental impacts are expected to be limited and sites of nature conservation are unlikely to be affected. Parts of the project fall under Annex II of the EIA Directive (2011/92/EU); therefore, the need for an EIA will be determined by the Competent Authority according to criteria established in Annex III of the Directive. Details will be verified during appraisal.

    The promoter is a publicly-owned undertaking. The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EC and/or Dir 2004/17/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - EFFICIENT UTILITY INFRASTRUCTURE KLAGENFURT
    Publication Date
    23 Oct 2014
    Document language
    Main Topic
    Lending
    Document Number
    55556107
    Document Focus
    Environmental Information
    Project Number
    20140216
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - EFFICIENT UTILITY INFRASTRUCTURE KLAGENFURT
    Publication Date
    16 Oct 2020
    Document language
    Main Topic
    Lending
    Document Number
    130837353
    Document Focus
    Environmental Information
    Project Number
    20140216
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications