Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 55,000,000
    Countries
    Sector(s)
    Spain : € 55,000,000
    Water, sewerage : € 55,000,000
    Signature date(s)
    28/05/2015 : € 25,000,000
    1/07/2015 : € 30,000,000

    Summary sheet

    Release date
    12 December 2013
    Status
    Reference
    Signed | 28/05/2015
    20130248
    Project name
    Promoter - financial intermediary
    NAVARRA IRRIGATION EFFICIENCY
    COMUNIDAD FORAL DE NAVARRA
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 55 million
    EUR 131 million
    Location
    Sector(s)
    Description
    Objectives

    The project consists of the construction and operation of a pressurised, gravity fed water distribution system for rehabilitating the ecological status of Arga and Ega rivers and irrigating 15,272 ha of arable land. The system derives all water from the existing Itoiz dam through Canal of Navarra. It acts as a substitute for pumping irrigation water up from the over-exploited local river basins. The project increases the efficiency of water and energy use. It is expected to increase yields and open valuable options for new crop patterns.

    Environmental Protection, Climate Action (Transversal) and Irrigation.

    Environmental aspects
    Procurement

    The project is a part of the Canal de Navarra, which was included in the Ebro River Basin Management Plan. It involved water transfer between sub basins of the Ebro River. As such it was subject to Annex I of the EIA Directive (2011/92/EU) and an EIA has been prepared. A SEA was carried out as part of the RBMP procedure. The project involves the restructuring of rural land holdings and is a water irrigation project for agriculture. As such it falls under Annex II of the EIA Directive (2011/92/EU). Environmental permits have been granted by the competent authority. Details will be assessed at appraisal.

    The Promoter will seek a PPP model implying a concession for the construction and operation of the targeted infrastructure. The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Dir 2004/18/EC, 2004/17/EC and Dir. 2007/66/EC [amending Directives 1989/665/EEC and 1992/13/EEC]), with publication of tender notices in the EU Official Journal, as and where required.

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Data Sheet (ESDS) - NAVARRA IRRIGATION EFFICIENCY
    Publication Date
    28 Mar 2014
    Document language
    Main Topic
    Lending
    Document Number
    50653421
    Document Focus
    Environmental Information
    Project Number
    20130248
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - NAVARRA IRRIGATION EFFICIENCY
    Publication Date
    28 Mar 2014
    Document language
    Main Topic
    Lending
    Document Number
    52230829
    Document Focus
    Environmental Information
    Project Number
    20130248
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - NAVARRA IRRIGATION EFFICIENCY
    Publication Date
    28 Mar 2014
    Document language
    Main Topic
    Lending
    Document Number
    52248157
    Document Focus
    Environmental Information
    Project Number
    20130248
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications