Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

Summary sheet

Release date
21 November 2025
Status
Reference
Approved | 10/12/2025
20220666
Project name
Promoter - financial intermediary
AIN SOKHNA GREEN AMMONIA
SCATEC ASA
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
not disclosed
not disclosed
Location
Sector(s)
Description
Objectives

The project entails the development, implementation and operation of a 100 MW electrolysis plant in Egypt for the production of hydrogen. The produced hydrogen will be used in an ammonia production plant in Ain Sokhna.

The aim is to produce Renewable Fuel of Non-Biological Orgin (RFNBO) for the European market and in accordance with EU requirements. In addition, the project intends to decarbonise ammonia production in Egypt by utilising renewable hydrogen as a feedstock instead of grey hydrogen, supporting Egypt's Nationally Determined Contributions (NDC) commitments. The project also intends to contribute to Egypt's National Low Carbon Hydrogen Strategy, which aims to position Egypt as a global renewable hydrogen hub. The project is in line with the EU-Egypt Strategic and Comprehensive Partnership and the priorities outlined in the Multi-annual cooperation program (2021-2027) between EU and Egypt.

Environmental aspects
Procurement

The related impacts will have to be assessed by the relevant environmental studies for compatibility with the EIB's environmental and social standards. The local authority has already issued the environmental permit for the electrolyser.

The promoter shall ensure that implementation of the project will be done in accordance with the EIB's Guide to Procurement. The project seems to be operating without exclusive or special rights within the meaning of the EU Utilities Directive 2004/17/EC and 2014/25/EU, hence private sector procurement procedures will apply.

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Milestone
Under appraisal
Approved
10 December 2025
Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - AIN SOKHNA GREEN AMMONIA
Publication Date
11 Dec 2025
Document language
Main Topic
Lending
Document Number
249022246
Document Focus
Environmental Information
Project Number
20220666
Sector(s)
Countries
Publicly available
Download now
Other links

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications