    Summary sheet

    Release date
    22 February 2023
    Status
    Reference
    Approved | 04/04/2022
    20210642
    Project name
    Promoter - financial intermediary
    ENDESA WIND AND SOLAR TICO ALLOCATION
    ENEL GREEN POWER ESPANA SL
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 250 million
    EUR 501 million
    Location
    Sector(s)
    • Energy - Electricity, gas, steam and air conditioning supply
    Description
    Objectives

    The current operation refers to solar and wind renewable energy generation projects allocation under the Framework Loan (FL) 2020-0916, approved by the EIB Board of Directors on 22.07.2021 (CA/545/21/451).

    The aim is to contribute to achieve the EU-wide target of reaching 32% of energy from renewable sources in gross final energy consumption by 2030, as set out in the Renewable Energy Directive (EU 2018/2001). It also contributes towards the renewable energy targets outlined in the Spain's National Energy and Climate Plan (NECP). The operation is in line with both the EIB's cohesion financing and with the lending priority related to renewable energy and climate action.

    Additionality and Impact

    The project increases renewable energy generation capacity in Spain and contributes to national and EU 2030 climate objectives. The financing of this project also contributes to Bank's lending priority objectives on Renewable Energy as well as on climate action, environmental sustainability and on economic and social cohesion. The project produces electricity from low carbon sources (solar PV and on-shore wind), addressing the market failure of negative climate and environmental externalities, through the reduction of carbon emissions and air pollution (compared to fossil-fuel generation). As the schemes are expected to rely (at least partially) on revenues from the market (the wholesale market and/or unsubsidized commercial Power Purchase Agreements), and potentially revenues from market-based public support (Contracts for Difference), in a sector characterised by incomplete markets (limited forward/hedging, lack of scarcity pricing and lack of locational pricing), the project improves market efficiency and competition. Thus the operation is expected to yield good quality and results, thanks to avoided GHG emissions and fair employment creation. The EIB's contribution will be most visible on the financial contribution side by accelerating the fundraising process and crowding in other financiers. The schemes are located in EIB Cohesion Priority regions.

    Environmental aspects
    Procurement

    The transmission line for "Apicio" Photovoltaic (PV) plant (part of "Brovales" cluster) is included in the Annex I of the environmental impact assessment (EIA) Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU). All the PV plants and other grid interconnection infrastructure are included in the Annex II of the EIA Directive and have been screened in by the competent authority. All plants and associated infrastructure underwent an EIA process, including public consultation. The plants and associated infrastructure obtained their environmental permits (Declaración de Impacto Ambiental - DIA) between December 2019 and February 2021.

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the promoter is subject to the EU public procurement legislation then the Bank would require the promoter to apply those rules.

    Milestone
    Approved
    4 April 2022
    Related documents
    Related projects

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Memoria Complementaria de Subsanación del Estudio de Impacto Ambiental - Parque Eólico Tico
    Publication Date
    8 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153604196
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Documento Ambiental - Tico Solar 2
    Publication Date
    9 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    167949272
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - Planta Fotovoltaica 'Beturia"
    Publication Date
    6 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    154797931
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - Planta Fotovoltaisica 'Ardila'
    Publication Date
    7 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153609483
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - Planta Fotovoltaica 'Veracruz'
    Publication Date
    8 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    154805620
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Documento Ambiental - Tico Solar 1
    Publication Date
    9 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    167942179
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - Planta Fotovoltaica 'Nertobriga' (Tome I)
    Publication Date
    7 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153603333
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Informe de Prospección Arqueológica
    Publication Date
    7 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153605626
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - ENDESA WIND AND SOLAR TICO ALLOCATION
    Publication Date
    7 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    149897641
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio hidrológico y de Inundabilidad - Cincinato
    Publication Date
    7 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153608816
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - Planta Fotovoltaica 'Apicio'
    Publication Date
    6 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    154807281
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Documento Resumen - Cincinato
    Publication Date
    7 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153602954
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - Planta Fotovoltaica 'El Doblón'
    Publication Date
    6 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    154801274
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - Planta Fotovoltaica 'Nertobriga' (Tome I)
    Publication Date
    7 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153605384
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Anejo de Integratión Ambiental - Parque Eólico Tico
    Publication Date
    9 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153605120
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Memoria de Compatibilidad con DIA - Parque Eólico Tico
    Publication Date
    9 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153602256
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio hidrológico y de Inundabilidad - Nertobriga
    Publication Date
    9 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153607531
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - 'Ardila' - Planos de proyecto técnico
    Publication Date
    6 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    154801063
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - Planta Fotovoltaica 'Cincinato' (Tome II)
    Publication Date
    7 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153605623
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - Planta Fotovoltaica 'Puerta Palmas'
    Publication Date
    8 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    154801650
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - Planta Fotovoltaica 'Cincinato' (Tome I)
    Publication Date
    7 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153610054
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Estudio de Impacto Ambiental - Parque Eólico 'Tico'
    Publication Date
    7 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    167950857
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Memoria Urbanística - Nertobriga
    Publication Date
    9 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153608790
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - ENDESA WIND AND SOLAR TICO ALLOCATION - Memoria Urbanística - Cincinato
    Publication Date
    7 Mar 2023
    Document language
    Main Topic
    Lending
    Document Number
    153607828
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Environmental and Social Completion Sheet (ESCS) - ENDESA WIND AND SOLAR TICO ALLOCATION
    Publication Date
    28 Nov 2024
    Document language
    Main Topic
    Lending
    Document Number
    189586856
    Document Focus
    Environmental Information
    Project Number
    20210642
    Sector(s)
    Regions
    Countries
    Publicly available
    Download now
    Link to source

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

    Related publications