Search EN menu en EIB GROUP CLIENT PORTAL
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

Signature(s)

Amount
€ 400,000,000
Countries
Sector(s)
Poland : € 400,000,000
Transport : € 400,000,000
Signature date(s)
16/12/2022 : € 400,000,000
Link to source

Summary sheet

Release date
11 May 2022
Status
Reference
Signed | 16/12/2022
20210421
Project name
Promoter - financial intermediary
S1 EXPRESSWAY PYRZOWICE - BIELSKO-BIALA
MINISTRY OF INFRASTRUCTURE / GDDKIA - REPUBLIC OF POLAND
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 400 million
EUR 914 million
Location
Sector(s)
Description
Objectives

The project concerns the construction of S1 Expressway sections between Pyrzowice and Dabrowa Gornicza and between Kosztowy and Bielsko-Biala, including the Oswiecim bypass.

The project contributes to an improved efficiency of the Baltic - Adriatic Trans-European Transport Network (TEN-T) corridor in Southern Poland by providing an efficient link between the A1 motorway and the S1 expressway near Katowice. The project is addressing market/network failures related to accessibility and safety. The project will improve traffic flow efficiency and road safety by providing shorter links and diverting heavy and transit traffic from National roads, which are passing through towns and settlements. The project is located in a cohesion region of Poland (Slaskie vojevodship). Overall, the project will contribute towards fulfilling public policy objectives aimed at the development of an efficient and safe transport system along the TEN-T network. The project includes the construction of approximately 60 km of S1 expressway on three non-continuous sections and a 9 km long Oswiecim bypass connecting to the new S1 expressway, thereby improving accessibility and market integration.

Additionality and Impact

The Project concerns the construction of: (i) the S1 expressway in south Poland near Katowice, and, (ii) the bypass road of Oswiecim, connecting it with the new expressway. The Project contributes to an improved efficiency of the Baltic - Adriatic TEN-T corridor in Southern Poland by providing an efficient link between the A1 motorway and the S1 expressway near Katowice. The Project includes the construction of approximately 60 km of S1 expressway on three non-continuous sections and a 9 km long Oswiecim bypass connecting to the new S1 expressway, thereby improving accessibility and market integration. The Project contributes to the reduction of safety related negative externalities, by diverting heavy and transit traffic from the existing townships and villages crossed by the National and local roads. The terms and conditions of the EIB loan, notably in terms of long tenor (up to 30 years), flexible terms of drawdowns adjusted to the needs of the Project and advantageous financial terms will increase the financial flexibility and investment capacity of GDDKiA and will be complementary to EU grants and national financing. The Bank's contribution will therefore facilitate the completion of the Project on favourable terms and in a timely manner.

Environmental aspects
Procurement

The project falls under Annex I of the EIA Directive 2014/52/EU, amending the EIA Directive 2011/92/EU, requiring a full environmental impact assessment (EIA) procedure. EIA studies have been completed and the competent authorities have issued environmental decisions as well as the development permits for two of the project sections. Taking into consideration that on one of the sections the project alignment crosses environmentally sensitive areas, particular attention during the appraisal will be on compliance with the environmental and social standards and impacts on NATURA 2000 specific conservation objectives.

As the procurement is underway, with five of the foreseen seven works contracts being already signed, the Bank will verify that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU), as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Impact Assessment (ESIA) - S1 EXPRESSWAY PYRZOWICE - BIELSKO-BIALA - Pyrzowice-Podwarpie - Raport o oddziaływaniu na środowisko
Publication Date
4 Jul 2022
Document language
Main Topic
Lending
Document Number
151221912
Document Focus
Environmental Information
Project Number
20210421
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S1 EXPRESSWAY PYRZOWICE - BIELSKO-BIALA - Kosztowy – Bielsko Biala - Raport o oddziaływaniu na środowisko
Publication Date
4 Jul 2022
Document language
Main Topic
Lending
Document Number
158569069
Document Focus
Environmental Information
Project Number
20210421
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S1 EXPRESSWAY PYRZOWICE - BIELSKO-BIALA -Podwarpie – Dabrowa Gornicza - Raport o oddziaływaniu na środowisko
Publication Date
4 Jul 2022
Document language
Main Topic
Lending
Document Number
151232435
Document Focus
Environmental Information
Project Number
20210421
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Impact Assessment (ESIA) - S1 EXPRESSWAY PYRZOWICE - BIELSKO-BIALA - Pyrzowice-Podwarpie - Raport o oddziaływaniu na środowisko- NTS
Publication Date
4 Jul 2022
Document language
Main Topic
Lending
Document Number
151220796
Document Focus
Environmental Information
Project Number
20210421
Sector(s)
Regions
Countries
Publicly available
Download now
Environmental and Social Data Sheet (ESDS) - S1 EXPRESSWAY PYRZOWICE - BIELSKO-BIALA
Publication Date
10 Sep 2022
Document language
Main Topic
Lending
Document Number
150714881
Document Focus
Environmental Information
Project Number
20210421
Sector(s)
Regions
Countries
Publicly available
Download now

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications