Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 65,000,000
    Countries
    Sector(s)
    Mozambique : € 65,000,000
    Transport : € 65,000,000
    Signature date(s)
    30/04/2009 : € 23,000,000
    30/04/2009 : € 42,000,000
    Link to source

    Summary sheet

    Release date
    14 October 2008
    Status
    Reference
    Signed | 30/04/2009
    20080231
    Project name
    Promoter - financial intermediary
    Beira Corridor Project

    CFM – Portos e Caminhos de Ferro de Moçambique

    CCFB – Companhia dos Caminhos de Ferro da Beira.

    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    Up to USD 92 million (equivalent to EUR 71 million).
    USD 254 million (equivalent to EUR 195 million).
    Location
    Sector(s)
    Description
    Objectives

    Rehabilitation of the transport infrastructure of the Beira corridor, including rehabilitation of the Sena railway line and restoration of the Beira port access channel to its original design characteristics.

    The project aims at reducing transports costs in the Beira corridor (both at the port and on the railway), improving the safety conditions in the access to the port and ultimately contributing to poverty reduction in Mozambique and neighbouring land-locked countries by improving the performance of the Beira corridor transport system.

    Environmental aspects
    Procurement

    If situated in the European Union, the rail component would likely fall outside the scope of the Environmental Impact Assessment (EIA) Directive, as the works consist of returning existing assets to their original state.  From the Bank’s initial review of available documentation, and subject to further field assessment during the appraisal mission, the port component, if within the EU, could be considered as falling under Annex II of the EU Directive 97/11 but not requiring a full EIA. The Bank’s appraisal mission will review environmental studies and procedures and public consultation for the two components in order to (a) confirm that the project complies with the principles of EU environmental regulations and with national legislation, (b) verify that no internationally/locally protected biodiversity area is likely to be affected, and (c) assess the social impact of the project.

    The Bank will require that the promoters implement the project in compliance with the Bank’s Guide to Procurement. The promoters’ procurement plan and procedures will be reviewed during appraisal.

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    News & Stories

    Photogallery

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications