Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten
    Referenz: 20140363
    Veröffentlichungsdatum: 5 Dezember 2014

    Projektträger – zwischengeschaltetes Finanzinstitut

    PKP POLSKIE LINIE KOLEJOWE SA

    Ort

    Beschreibung

    The project consists of the modernisation of approximately 71km of mainline track between Czempin and Rawicz, which is part of the Poznan – Wroclaw line and of the European Rail Corridor E59. The section is located on the core TEN-T rail network.

    Ziele

    The modernisation will entail replacing the track bed, track, structures and catenary, largely along the existing alignment, together with improvements to the power supply, signalling, telecoms and stations. The project will help prepare the section of line for future installation of the European Railway Traffic Management System (ERTMS), scheduled as part of the Polish National ERTMS Deployment Plan for implementation within the next ten years. The project will complement existing EIB operations, PLK Railway Modernization E59 Phase 1 (CA/11/273) and PLK Railway Modernization E59 Phase 2 (CA/12/411). The promoter intends to submit an application to co-finance the project under the Connecting Europe Facility.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 100 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 383 million

    Umweltaspekte

    The project falls under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU) and has been screened in by the competent authority. The EIA is to be analysed during the appraisal. The project’s potential impact on protected areas and species, in accordance with the Habitats Directive (92/43/EEC) and Birds Directive (2009/147/EC), are to be appraised further.

    Auftragsvergabe

    The promoter is a public contracting authority subject to the provisions of the relevant directives. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/will be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Projektstatus

    Unterzeichnet - 5/03/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Polen Verkehr