    Referenz: 20130588
    Veröffentlichungsdatum: 3 Juli 2014

    Projektträger – zwischengeschaltetes Finanzinstitut

    BANGLADESH RAILWAY

    Ort

    Beschreibung

    Construction of a second track and upgrading of the existing track on the 72 km section between Laksam and Akhaura in eastern central Bangladesh. The project is part of a broader program to upgrade, by 2020, the whole 321 km rail corridor between the capital Dhaka and Chittagong, the second city and main national port. The line is part of the southern corridor of the Trans Asian Railway network, promulgated in 1999 by the UN Economic and Social Commission for Asia and Pacific. The project will also facilitate the rail connection of the landlocked NE States of India with a seaport.

    Ziele

    The proposed operation is in line with the objectives of the 2014-2020 External Lending Mandate through its contribution to the development of economic infrastructure and climate change mitigation. The government's 2011-2015 Five Year Plan and 2004 National Land Transport Policy highly prioritise the development of this rail corridor. The project is also consistent with the EU Country Strategy Paper, 2007-2013 due to its contribution to enhancing trade, investment and economic development.

    Kommentar(e)

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 135 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 555 million

    Umweltaspekte

    If situated in the EU, the project would fall under Annex II of the EIA Directive. In accordance with domestic legislation, it has been automatically screened in for a full EIA procedure. EIA scoping was completed in May 2013 and the preparation of the Environmental Impact Assessment report is currently ongoing. The process and outcome of the EIA procedure is to be assessed during appraisal.
    The project will require the acquisition of about 60 ha of land entailing permanent involuntary resettlement of about 1460 households/businesses and about 720 agricultural plots plus generate some temporary rail and limited road traffic disruption. Compliance with relevant EIB Social Standards will be reviewed.

    Auftragsvergabe

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Projektstatus

    Unterzeichnet - 15/10/2015

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Bangladesch Verkehr