    Referenz: 20090712
    Veröffentlichungsdatum: 22 August 2012

    Projektträger – zwischengeschaltetes Finanzinstitut

    WEST AFRICAN POWER POOL

    Ort

    Beschreibung

    The power interconnection between Côte d'Ivoire, Liberia, Sierra Leone and Guinée (CLSG) is a priority project of the West African Power Pool (WAPP) that will enable power exchanges between the four countries.

    Ziele

    This project will enable power exchanges between Côte d'Ivoire, Liberia, Sierra Leone and Guinée, thereby improving the supply of electricity in these post-conflict countries. In the medium term, the project should enable the development of the hydropower potential of Guinée. In Sierra Leone, the availability of low cost and reliable electricity is a necessary prerequisite for the recovery of economic and human development activites.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    EUR 75 million

    Gesamtkosten (voraussichtlicher Betrag)

    EUR 370 million

    Umweltaspekte

    The project, if implemented inside the EU, would fall under Annex 1 of EIA directive, requiring an EIA. The promoter has conducted an ESIA with an international consultant. The process has included public consultation. The identified environmental risks are typical for high voltage transmission projects, including vegetation and forest cleaning, visual impact, avifauna collisions and resettlement of people from transmission corridor. The study includes appropriate mitigating measures like re-routing the line at the areas of environmental hotspots, visual impact minimisation and resettlement action plan.

    Auftragsvergabe

    The Bank will require that the procurement is carried out in accordance with the EIB's Guide to Procurement and will provide guidance to the promoter.

    Projektstatus

    Unterzeichnet - 10/12/2012

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Regionalvorhaben - Westafrika Energie