    Referenz: 20030068
    Veröffentlichungsdatum: 19 Dezember 2003

    Projektträger – zwischengeschaltetes Finanzinstitut

    The project will be implemented by the Ministry of Public Works and Housing (MPWH) on behalf of the Hashemite Kingdom of Jordan.

    Ort

    Beschreibung

    The project consists in the construction of the eastern section (40.85 km) of the Amman Ring Road (total length 116 km). It will provide a bypass on the main North-South link between the Syrian and Iraqi borders on one hand and the port of Aqaba on the other, and serve as a distributor for local traffic concerning the rapidly growing capital of Jordan, Amman.

    Ziele

    The project will alleviate traffic congestion and improve safety by reducing frequent bottlenecks that are present along the existent Hizam road. Economic benefits will accrue in the form of time savings, vehicle operating cost savings and reduction in accident rates.

    Sektor(en)

    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)

    up to EUR 30m (EUROMED II).

    Gesamtkosten (voraussichtlicher Betrag)

    Estimated at JOD 105m (EUR 132.2m).

    Umweltaspekte

    A full Environmental Impact Assessment (EIA) and a Land Acquisition and Resettlement Plan (LARP) were completed in 1999 for the road component of the project. These studies are currently being updated, accounting for changes in the settlement patterns in the project area, on the basis of an unchanged alignment. The scopes of both EIA and LARP have been broadened to include the customs depot and inland port facilities.

    Auftragsvergabe

    As on other projects financed previously in the Jordanian public sector, it is expected that the MPWH will follow usual open public tender procedures in line with the Bank’s procurement guidelines.

    Projektstatus

    Unterzeichnet - 22/12/2003

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Tags

    Jordanien Verkehr