Summary sheet

Release date
11 November 2025
Status
Reference
Approved | 06/01/2026
20240660
Project name
Promoter - financial intermediary
LINZ VERSORGUNGSINFRASTRUKTUR
LINZ AG FUER ENERGIE TELEKOMMUNIKATION VERKEHR UND KOMMUNALE DIENSTE
Proposed EIB finance (Approximate amount)
Total cost (Approximate amount)
EUR 200 million
EUR 334 million
Location
Sector(s)
  • Energy - Electricity, gas, steam and air conditioning supply
  • Water, sewerage - Water supply; sewerage, waste management and remediation activities
Description
Objectives

The project will finance the rehabilitation of water and wastewater infrastructure and heat exchanger for district heating and district cooling in the City of Linz.

The project is an investment programme that comprises investment schemes in the promoter's district heating and cooling networks, water supply system, sewer network and the wastewater treatment plant. The programme's energy component includes two investments in district heat generation and cooling in Linz: - The first project component concerns the construction of two District Heating (DH) exhaust heat recovery units with heat pumps (35MW in total), in a waste incinerator and biomass power plant in Linz Mitte. - The second project component concerns the construction of district cooling centre FHKW Mitte (20MW), and expansion of the district cooling network (47 MW connection load), including the construction of a multi-utility tunnel. Both district heating and cooling systems will fulfil the criteria of efficient networks, as stipulated by the Energy Efficiency Directive. The water and wastewater part of the programme comprises four main components: - Water production: modernisation of wells, pumping stations and service reservoirs, - Water distribution: replacement and/or rehabilitation of transmission and distribution mains and house connections, - Wastewater collection: replacement and/or rehabilitation of sewers, - Wastewater treatment: modernisation of several components in the wastewater treatment plant.

Environmental aspects
Procurement

For the water component, the project aims at maintaining compliance with the Urban Wastewater Treatment Directive (91/271/EEC), the Drinking Water Directive (2020/2184/EU), and the Water Framework Directive (2000/60/EC). For both the energy and water components, some schemes may fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The exact requirements, as well as, where and if applicable, the requirements of Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC, will be verified during appraisal. The schemes are expected to have limited environmental impact. The environmental and social due diligence will follow the programme lending approach according to the EIB's standards. It will focus on the promoter's capacity to implement the programme in line with the EIB's environmental and social standards and requirements.

The Bank will require the promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

Milestone
Under appraisal
Approved
6 January 2026
Link to source

Disclaimer

Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

Documents

Environmental and Social Data Sheet (ESDS) - LINZ VERSORGUNGSINFRASTRUKTUR
Publication Date
8 Jan 2026
Document language
Main Topic
Lending
Document Number
255777575
Document Focus
Environmental Information
Project Number
20240660
Regions
Countries
Publicly available
Download now
Other links

General enquiries and comments

The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
Alternatively, the EIB can be contacted through its external offices.
Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

Media enquiries

Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

Complaints mechanism

Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

Zero tolerance against fraud and corruption

The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Investigations Division. All reports will be treated as strictly confidential and handled in line with EIB investigation procedures and the EIB Group Anti-Fraud Policy.

Related publications