Recherche FR menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées

    Signature(s)

    Montant
    200 000 000 €
    Pays
    Secteur(s)
    Autriche : 200 000 000 €
    Eau, assainissement : 94 000 000 €
    Énergie : 106 000 000 €
    Date(s) de signature
    16/04/2026 : 94 000 000 €
    16/04/2026 : 106 000 000 €

    Fiche récapitulative

    Date de publication
    11 novembre 2025
    Statut
    Référence
    Signé | 16/04/2026
    20240660
    Nom du projet
    Promoteur – Intermédiaire financier
    LINZ VERSORGUNGSINFRASTRUKTUR
    LINZ AG FUER ENERGIE TELEKOMMUNIKATION VERKEHR UND KOMMUNALE DIENSTE
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 200 million
    EUR 334 million
    Lieu
    Secteur(s)
    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    The project will finance the rehabilitation of water and wastewater infrastructure and heat exchanger for district heating and district cooling in the City of Linz.

    The project is an investment programme that comprises investment schemes in the promoter's district heating and cooling networks, water supply system, sewer network and the wastewater treatment plant. The programme's energy component includes two investments in district heat generation and cooling in Linz: - The first project component concerns the construction of two District Heating (DH) exhaust heat recovery units with heat pumps (35MW in total), in a waste incinerator and biomass power plant in Linz Mitte. - The second project component concerns the construction of district cooling centre FHKW Mitte (20MW), and expansion of the district cooling network (47 MW connection load), including the construction of a multi-utility tunnel. Both district heating and cooling systems will fulfil the criteria of efficient networks, as stipulated by the Energy Efficiency Directive. The water and wastewater part of the programme comprises four main components: - Water production: modernisation of wells, pumping stations and service reservoirs, - Water distribution: replacement and/or rehabilitation of transmission and distribution mains and house connections, - Wastewater collection: replacement and/or rehabilitation of sewers, - Wastewater treatment: modernisation of several components in the wastewater treatment plant.

    Additionnalité et impact

    The project contributes to natural resource efficiency and environmental protection, as well as to climate action throughout investments in the energy and water sectors. It is in line with the Bank's lending policies/orientation for these sectors and the European policy for the protection of the environment, in particular the objectives defined in the relevant Directives (Energy Efficiency, Renewable Energy, Water Framework, Urban Wastewater Treatment, etc.). The energy component contributes to maintaining or increasing security of supply and reduces carbon and air pollution externalities by enabling the integration of clean energy supply and increasing efficiency. The water component contributes to mitigating market failures in the sector by financing infrastructure which generates positive environmental and health externalities that are not fully internalised in water tariffs.

    These outcomes would not be realised to the same extent without public intervention. The EIB's role as anchor investor is expected to attract additional investors, strengthen the utility's financial position, and diversify its funding sources. EIB support brings tangible financial value by lowering funding costs and offering longer tenors than typically available, and it is expected to accelerate its overall implementation. This is particularly relevant in today's volatile market environment.


    Aspects environnementaux
    Passation des marchés

    For the water component, the project aims at maintaining compliance with the Urban Wastewater Treatment Directive (91/271/EEC), the Drinking Water Directive (2020/2184/EU), and the Water Framework Directive (2000/60/EC). For both the energy and water components, some schemes may fall under Annex II of the environmental impact assessment (EIA) Directive 2011/92/EU as amended by Directive 2014/52/EU, which requires the competent national authority to determine the need for an EIA. The exact requirements, as well as, where and if applicable, the requirements of Birds Directive 2009/147/EC and Habitats Directive 92/43/EEC, will be verified during appraisal. The schemes are expected to have limited environmental impact. The environmental and social due diligence will follow the programme lending approach according to the EIB's standards. It will focus on the promoter's capacity to implement the programme in line with the EIB's environmental and social standards and requirements.

    The Bank will require the promoter to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Étapes
    À l'examen
    Approuvé
    Signé
    6 janvier 2026
    16 avril 2026

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - LINZ VERSORGUNGSINFRASTRUKTUR
    Date de publication
    8 Jan 2026
    Langue
    Sujet général
    Prêts
    Numéro du document
    255777575
    Thématique du document
    Information Environnementale
    Numéro du projet
    20240660
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes