- Energie - Energieversorgung
The project concerns the design, construction, and operation of a medium-scale offshore wind farm with ca. 340 MW total capacity. The project site is located 27km off the coast of south-east England, adjacent to an existing wind farm. The project's grid connection assets will be transferred to an independent operator (OFTO) after construction.
The development of offshore wind energy will support EU and national targets for renewable energy generation and contribute to security of energy supply and environmental objectives. The project is therefore eligible under Article 309 point (c) common interest (energy/renewable energy). The project will further contribute to the Bank's priority objectives for energy sector lending related to renewable energy and climate action (transversal).
The UK government conducted a strategic environmental assessment (SEA) in 2002/03 for its plan to develop offshore wind in its territory. Three large areas - the Thames Estuary, the Greater Wash and the North West (Irish Sea) - identified by the government as being potentially suitable, were assessed. The project site falls within the Thames Estuary area. The project is an extension to an existing 504 MW offshore wind farm. By virtue of its technical characteristics the project is classified as an Annex II project according to the Directive 2011/92/EU on environmental impact assessment (EIA). National legislation requires a full EIA including public consultation for offshore wind farms. The promoter's environmental impact statement analyses the project's environmental and social impacts against the backdrop of the adjacent offshore wind farm. It concludes that there is no significant cumulative impact related to the project. There are a number of local, national and international designated sites of nature conservation importance in the vicinity of both the onshore and offshore components of the project. The promoter's environmental studies conclude that the project has no significant negative impact on these sites. Consents related to the project's onshore and offshore activities were granted by the competent authorities in 2013. Details of the environmental authorisation process, including its consultation process and appropriate assessment, will be assessed during appraisal to verify compliance with the Bank's environmental policy.
Directive 2004/17/EC does not apply to contracts awarded by contracting entities and intended to enable them to carry out electricity supply in England, Scotland and Wales (Decision 2007/141/EC). The project is therefore considered to be exempt from public procurement requirements. This will be confirmed during appraisal.
Haftungsausschluss
Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).
Dokumente
Aktuelles und Storys
Allgemeine Fragen und Anmerkungen
Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.
Medienanfragen
Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.
Beschwerdemechanismus
Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.
„Null Toleranz“ gegenüber Betrug und Korruption
Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.
Weitere Veröffentlichungen