Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20220456
    Date de publication: 20 février 2023

    Promoteur – Intermédiaire Financier

    ORANGE

    Lieu

    Description

    The project will finance the design and early rollout of a 5G mobile telecommunications network, as well as the densification and upgrade of 4G across the country. In detail, it concerns the deployment of active radio access equipment, expansion of the core 5G standalone network and backhaul upgrade.

    Additionality and Impact

    The project supports the development of the French 5G mobile infrastructure enabling ultra-fast data transfer through this very high capacity network and it is fully in line with the targets set out by the 5G for Europe Action Plan. The project also supports the goal of the Electronic Communication Code to promote the roll-out of 5G and to foster infrastructure competition. Finally the project is aligned with the recently established 2030 EU Digital Compass targets.


    Furthermore the project contributes directly to the EU broadband targets for 2025 presented in "Connectivity for a Competitive Digital Single Market - Towards a European Gigabit Society", which states that by 2025 all urban areas, as well as major roads and railways, should have uninterrupted 5G wireless broadband coverage, starting with fully-fledged commercial service in at least one major city in each EU member state already by 2020. 


    EIB's involvement provides a flexible financial product to the borrower (e.g. flexible drawdowns, lengthy availability period, etc.), allowing it to diversify its financing sources. The Bank's capacity to extend a sizable loan from one source is highly appreciated by the client.

    Objectifs

    Orange aims at increasing its 5G coverage across France, including deep indoor coverage, provide fibre connectivity to mobile sites, as well as coping with the increased traffic.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 500 million

    Coût total (montant approximatif)

    EUR 1082 million

    Aspects environnementaux

    Investments in mobile telecommunications networks do not fall under Annexes of Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending the EIA Directive 2011/92/EU.

    Passation des marchés

    The promoter has been assessed by the EIB as being a private company not being subject to EU rules on public procurement or concessions.

    Statut

    Signé - 14/02/2023

    Milestone
    À l'examen
    Approuvé
    Signé
    14 décembre 2022
    14 février 2023

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    France Télécom