Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20220048
    Date de publication: 2 janvier 2023

    Promoteur – Intermédiaire Financier

    GRUPO EASYCHARGER SA

    Lieu

    Description

    The project will finance an Electrical Vehicle (EV) interurban charging network, consisting of fast and super fast chargers located in the Spanish highways and major roads network (mostly Trans-European Networks - TEN-T), thus contributing to accelerate the EV adoption curve.

    Additionality and Impact


    The project contributes to the EIB's objective of sustainable transport, decarbonisation and the development of Trans-European Transport Network ("TEN-T) infrastructure, thereby supporting EU policy objectives. The project is fully aligned with the European Commission sustainable transport and low-emission mobility policies.


    Road vehicles account for three quarters of all transport emissions, and it will not be possible to reach the EU target of carbon neutrality by 2050 without a fundamental shift to electromobility in the roads sector. However, less than 1% of the road fleet is currently electrically powered and the lack of a comprehensive network of Electric Vehicle Charging Points is a significant factor in this market failure.


    Electrification of road transport generates positive externalities from reductions in emissions. The project tackles the 'first-mover' penalty resulting from the interdependency between the market for Electric Vehicles and completion of a comprehensive charging infrastructure network. The project will contribute:


    1. to reducing the negative environmental externalities of road transport and

    2. to developing the market for the deployment of alternative fuel vehicles and associated infrastructure.


    The EIB contribution makes a difference to the borrower as it will partially finance the deployment of the infrastructure, providing a fixed rate financing for a long tenor not easy available in the market. The Borrower also benefits from the possibility of blending EIB's financing with the alternative fuel facility offered by the European Commission.

    Objectifs

    The project will accelerate the electrification of road transport in Spain and thus prevent the emission of more than 0.9million tn of CO2 for the period 2022-2031. It will therefore contribute to achieve EU policy objectives, such as decarbonisation, sustainable transport and TEN-T infrastructure development, in line with the European Commission's sustainable transport and low-emission mobility policies.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 40 million

    Coût total (montant approximatif)

    EUR 126 million

    Aspects environnementaux

    The connections between the EV charging stations and the medium and low voltage power grid may fall under Annex II of the Directive 2014/52/EU amending the Directive 2011/92/EU on the assessment of the effects of certain public and private projects on environment impact assessment (EIA) directive. The EIB will require in those cases to be informed of the screening decision issued by the Competent Authority.

    Passation des marchés

    The Borrower has been assessed by the EIB as being a private company and hence not being subject to EU rules on public procurement or concessions.

    Statut

    Signé - 23/12/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Transports