Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20210421
    Date de publication: 11 mai 2022

    Promoteur – Intermédiaire Financier

    MINISTRY OF INFRASTRUCTURE / GDDKIA - REPUBLIC OF POLAND

    Lieu

    Description

    The project concerns the construction of S1 Expressway sections between Pyrzowice and Dabrowa Gornicza and between Kosztowy and Bielsko-Biala, including the Oswiecim bypass.

    Objectifs

    The project contributes to an improved efficiency of the Baltic - Adriatic Trans-European Transport Network (TEN-T) corridor in Southern Poland by providing an efficient link between the A1 motorway and the S1 expressway near Katowice. The project is addressing market/network failures related to accessibility and safety. The project will improve traffic flow efficiency and road safety by providing shorter links and diverting heavy and transit traffic from National roads, which are passing through towns and settlements. The project is located in a cohesion region of Poland (Slaskie vojevodship). Overall, the project will contribute towards fulfilling public policy objectives aimed at the development of an efficient and safe transport system along the TEN-T network. The project includes the construction of approximately 60 km of S1 expressway on three non-continuous sections and a 9 km long Oswiecim bypass connecting to the new S1 expressway, thereby improving accessibility and market integration.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 400 million

    Coût total (montant approximatif)

    EUR 914 million

    Aspects environnementaux

    The project falls under Annex I of the EIA Directive 2014/52/EU, amending the EIA Directive 2011/92/EU, requiring a full environmental impact assessment (EIA) procedure. EIA studies have been completed and the competent authorities have issued environmental decisions as well as the development permits for two of the project sections. Taking into consideration that on one of the sections the project alignment crosses environmentally sensitive areas, particular attention during the appraisal will be on compliance with the environmental and social standards and impacts on NATURA 2000 specific conservation objectives.

    Passation des marchés

    As the procurement is underway, with five of the foreseen seven works contracts being already signed, the Bank will verify that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU), as well as Directive 92/13/EEC or Directive 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 16/12/2022

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Transports