Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20210169
    Date de publication: 22 octobre 2021

    Promoteur – Intermédiaire Financier

    WODOCIAGI MIASTA KRAKOWA SA

    Lieu

    Description

    The project consists of water investments in the City of Krakow.

    Objectifs

    The project aims at enhancing the quality, security and climate change resilience of Krakow city's water management system by rehabilitating, upgrading and extending its water supply, wastewater collection and treatment, sludge management and storm water management systems.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    PLN 600 million (EUR 128 million)

    Coût total (montant approximatif)

    PLN 1581 million (EUR 338 million)

    Aspects environnementaux

    The project will contribute to ensuring compliance with key EU directives in the water sector notably the Drinking Water Directive 2020/2184, Urban Waste Water Treatment Directive (91/271/EEC) and the Water Framework Directive (2000/60/EC). Where and if applicable, the requirements of the EIA Directive 2014/52/EU amending the EIA Directive 2011/92/EU and SEA Directive 2001/42/EC will be respected. The Promoter will in such case, prior to utilising any EIB funds, be responsible for transmitting to the Bank the environmental impact assessment (EIA) for publication on its website. For any part of the project that may have an impact on a nature conservation site, the Promoter will be required to provide to the Bank information on the mitigating measures required to comply with the Habitats and Birds Directives (92/43/EEC and 2009/147/EC respectively).

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for implementation of the project have been and will be tendered in accordance with the applicable EU procurement legislation, Directive 2014/25/EU as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 23/12/2021

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Eau, assainissement