Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200802
    Date de publication: 23 avril 2021

    Promoteur – Intermédiaire Financier

    ACCEPTABLE CORPORATE(S),PUBLIC ENTITY(IES)

    Lieu

    Description

    Financing of eligible projects in the water sector in Poland.

    Objectifs

    The programme loan (PL) aims at addressing the investment needs of small and medium-sized water utilities in Poland. To date, three operators have already been identified as potential final beneficiaries (FB) of the PL, which are: (1) Aquanet, (2) Bytom, (3) Wroclaw. FB provide integrated water services (IWS) activities in Poland and are fully owned by the municipalities. The underlying investment programmes of the FB are based on Master Plans agreed by the operators with the local service regulators. The investment requirements, including mainly water treatment, distribution, wastewater collection and treatment, are aimed at the upkeep of efficient and sustainable water and wastewater services, increased resilience and compliance with the Urban Waste Water Treatment Directive 91/271/EEC and the Water Framework Directive 2000/60/EC, as embodied in the national legislation.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    PLN 2500 million (EUR 548 million)

    Coût total (montant approximatif)

    PLN 5000 million (EUR 1095 million)

    Aspects environnementaux

    The sub-operations under the PL are expected to have net positive environmental and social impacts, considering their focus on compliance with, amongst others, the Water Framework Directive 2000/60/EC, and the Urban Waste Water Treatment Directive 91/271/EEC. Where and if applicable, the requirements of the Environmental Impact Assessment Directive 2014/52/EU amending the EIA Directive 2011/92/EU, the Habitats and Birds Directives (92/43/EEC and 2009/147/EC, respectively) will be respected and the Bank will publish the full text of, and the non-technical summaries.

    Passation des marchés

    The Bank will require the final beneficiaries to ensure that contracts for implementation of the project will be tendered in accordance with the applicable EU procurement legislation, (Directive 2014/23/EU / 2014/24/EU / 2014/25/EU as well as Directive 92/13/EEC or Directive 89/665/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Approuvé - 22/07/2021

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Eau, assainissement