Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200890
    Date de publication: 11 octobre 2023

    Promoteur – Intermédiaire Financier

    LAND BERLIN,LAND BRANDENBURG

    Lieu

    Description

    The project concerns new regional passenger trains with hydrogen and battery powered propulsion systems for the Heidekrautbahn and Netz Ostbrandenburg networks in Berlin and Land Brandenburg. The first train (Heidekrautbahn) offers a suburban rail service in the capital area on the RB27 route (Berlin-Gesundbrunnen, Berlin-Karow/Berlin-Wilhelmsruh, Basdorf, Groß Schönebeck/Schmachtenhagen). The second one (Netz Ostbrandenburg) offers a regional rail service from Berlin to the north-east region in Brandenburg, across ten different lines, up to the Polish border.

    Objectifs

    The aim is to significantly improve rail services for commuters between the fast growing region around Neuruppin and Berlin.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 92 million

    Coût total (montant approximatif)

    EUR 285 million

    Aspects environnementaux

    The project does not fall under either Annex I or Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by Directive 2014/52/EU) as manufacturing and use of rail rolling stock is not included in either list. The need of EIA and/or assessment according to the Habitants Directive 92/43/EEC for associated facilities (e.g. maintenance workshops or depots), not included in the investment proposed but needed for the correct operation of the new rolling stock, will be analysed during the appraisal. Arrangements for the replacement or decommissioning of old rolling stock will be reviewed during appraisal. The project is expected to have a positive environmental impact by contributing to modal shift from road to railways.

    Passation des marchés

    For Heidekrautbahn, the promoter plans to issue a contract starting from 2024 on account of the integration of the contract with a Research and Development initiative for the use of hydrogen powered trains. For Netz Ost Brandenburg, the promoter has issued a competitive tender for 12 years worth of operations.

    Statut

    Signé - 10/12/2021

    Milestone
    À l'examen
    Approuvé
    Signé
    9 juin 2021
    10 décembre 2021

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Allemagne Transports