    Référence: 20200365
    Date de publication: 24 juillet 2020

    Promoteur – Intermédiaire Financier

    HELLENIC ELECTRICITY DISTRIBUTION NETWORK OPERATOR SA

    Lieu

    Description

    Multi-component investment programme covering the period 2021-2023 aimed at renovating and reinforcing the electricity distribution network in Greece. The programme consists of a large number of medium- and low-voltage electricity distribution schemes geographically dispersed throughout peninsular and insular Greece. The main purpose of the programme is to enable the connection of new system users and to improve the current standards of safety and reliability of the network.

    Objectifs

    The investment programme will enable the Promoter to connect new end-users including renewable generators, and improve the reliability and quality of electricity supply. Furthermore, the investments will take place in less-developed regions.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 330 million

    Coût total (montant approximatif)

    EUR 605 million

    Aspects environnementaux

    Some of the programme schemes may fall under Annex II of Directive 2014/52/EU amending the EIA Directive 2011/92/EU, thus requiring a review by the competent authorities at the planning/consent stage with due regard to the necessity for an environmental impact assessment (EIA). The impacts that can be typically expected from some schemes relate to visual impact, vegetation clearance, collision and electrocution of flying vertebrates, electromagnetic fields, noise nuisance and disturbance during construction. The appraisal will focus on the Promoter's capacity to implement the programme in line with the EIB environmental and social standards and requirements.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the schemes have been and will be tendered in accordance with the relevant applicable EU procurement legislation, Directive 2014/25/EU where applicable, as well as Directive 92/13/EEC, as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 2/12/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Grèce Énergie