Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200115
    Date de publication: 19 juin 2020

    Promoteur – Intermédiaire Financier

    NV HVC

    Lieu

    Description

    The project will support the promoter's heating business investment plan for the period 2020-2023. HVC'sinvestments concern both the expansion of its existing district heating networks in Alkmaar and Dordrecht, and its geothermal sources for the heating of greenhouses in the Westland area.

    Objectifs

    The EIB loan will finance the development and expansion of HVC's district heating (DH) networks and heat generation capacity in several locations in the Netherlands. The project scope comprises: (i) the extension of existing DH networks, currently supplied with residual heat from the Promoter's biomass and waste incineration plants in the municipalities of Alkmaar and Dordrecht (respectively in North Holland and South Holland provinces); as well as (ii) the expansion and development of the promoter's geothermal heat generation activities, including the associated DH network, in the municipality of Westland in the South Holland province.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 50 million

    Coût total (montant approximatif)

    EUR 224 million

    Aspects environnementaux

    Based on its technical characteristics, most of the project components are not expected to be subject to an Environmental Impact Assessment (EIA). However, the geothermal heat generation component as well as components potentially located close to a Natura 2000 site, would fall under Annex II of the Environmental Impact Assessment Directive (2014/52/EU amending 2011/92/EU), which requires the competent national authority to determine the need for an EIA. The extension of the DH systems is projected to be carried out in densely built areas.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been and will be tendered in accordance with the relevant applicable EU procurement legislation, (Directives 2014/24/EU and/or 2014/25/EU, where applicable, as well as Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 15/12/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pays-Bas Énergie