Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200023
    Date de publication: 23 avril 2021

    Promoteur – Intermédiaire Financier

    EMPRESA METROPOLITANA DE ABASTECIMIENTO Y SANEAMIENTO DE AGUAS DE SEVILLA SA

    Lieu

    Description

    The project concerns the financing of water schemes forming part of Empresa Metropolitana De Abastecimiento Y Saneamiento De Aguas De Sevilla (EMASESA's) investment programme over the period 2020-2024.

    Additionality and Impact

    The project consists of an investment loan that will finance EMASESA's 2020-2024 investment plan in the metropolitan area of Seville, Spain. These investments are aimed at improving existing water infrastructure as well as improving environmental performance.
    The project will ensure compliance with key European regulations in the water sector, and falls under the EIB's vertical policy objective of Sustainable Energy and Natural Resources whilst also contributing to the horizontal policy objective of Climate Action and Environmental Sustainability. The project will address a number of market failures, through positive externalities in the form of environmental and health benefits, notably increased resilience against climate risks and improved quality of water bodies through investments in stormwater management, and reduced greenhouse gas emissions through investments in renewable energy and energy efficiency improvements. These benefits are not reflected in market prices and would not be realised to the same extent without public intervention. Being located in Andalusia, a priority cohesion region in Spain, the project will contribute to the EU's economic social and territorial cohesion.The EIB provides an important financial contribution in the form of a financial advantage and longer tenor than the commonly available in the bank market, contributing therefore to greater diversification and stability of the borrower's financing. It is also additional as the EIB financing will represent a signalling effect to the banking system with regards to financing investments in the water sector at advantageous terms.

    Objectifs

    The proposed operation aims at supporting EMASESA's 2020-2024 investment programme in Sevilla's metropolitan area. It includes investments in water, rainwater collection and wastewater infrastructure to improve the efficiency, efficacy and reliability of water and wastewater services and ensure compliance with key EU directives, notably the Drinking Water Directive 98/83/EC, the Urban Waste Water Treatment Directive 91/271/EEC and the Water Framework Directive 2000/60/EC (i.e. WFD).

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 75 million

    Coût total (montant approximatif)

    EUR 162 million

    Aspects environnementaux

    In terms of economic benefits, the investment programme will deliver substantial environmental quality improvements and climate related benefits. The overall impact of the PL will be higher ecological quality of surface and groundwater resources, and increased service coverage quality and resilience to climate change. Where and if applicable, the requirements of the Environmental Impact Assessment (EIA) Directive 2014/52/EU, amending Directive 2011/92/EU, the Habitats Directive (92/43/EC) and the Birds Directive (2009/147/EC) will be respected.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU and Directive 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 5/08/2021

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Espagne Eau, assainissement