Référence: 20190820
Date de publication: 14 mai 2020

Promoteur – Intermédiaire Financier

CANTON OF SARAJEVO

Lieu

Description

The project will finance the reconstruction, modernisation and extension of the tram line in Sarajevo and the trolley bus network, by purchasing new trolley busses and trams, building new tram lines and tracks. It also includes road components (1st and 9th transversal road and South longitudinal road).

Objectifs

The aim is improve the urban transport in the Canton of Sarajevo, one of the ten canton of the Federation entity in Bosnia and Herzegovina. The project will improve the network and the level of services for the benefit of both the city and users. The operation supports the EIB's mandate objectives for the Candidate countries, by promoting sustainable and less polluting transport systems and safety investments.

Commentaires

The operation is expected to generate savings in local air/noise emissions as well as a reduction in green-house gas emissions as a result of the expected modal shift of passengers from private road transport to public transport modes or at least help to maintain the modal share of public transport as much as possible.

Secteur(s)

Garantie au titre du MPE

This operation is covered by the ELM Political Risk Guarantee.

Under Global Europe NDICI guarantee

Under EFSD+ Guarantee

Montant BEI envisagé (montant approximatif)

EUR 75 million

Coût total (montant approximatif)

EUR 185 million

Aspects environnementaux

If situated in the EU, manufacturing trolleybuses and trams does not fall within the scope of the EIA Directive 2011/92/EU; therefore no Environmental Impact Assessment (EIA) is required for those components. During appraisal, the Bank will review the measures to be taken by the promoter in the decommissioning of old trolleybuses and trams, as well as the design and manufacture of new trolleybuses and trams to confirm that best available technologies are applied. In the case of infrastructure components, if situated in the EU, these could fall under Annex II of the EIA Directive and could be subject to screening. For these components, compliance with the requirements of the EIA Directives and the development consents will be reviewed during appraisal.

Passation des marchés

The promoter has to ensure that any procurement procedures are done in accordance with the EIB's Guide to Procurement and the relevant applicable EU public procurement rules. In particular, the Bank will require that calls for international tenders be published in the EU Official Journal, as necessary. The EIB will enter into a delegation agreement with the European Bank for Reconstruction and Development (EBRD) for the project procurement of the purchase of trams in line with the Procedural Framework between EIB and EBRD for procurement in joint co-financed public sector.

Statut

Signé - 17/03/2021

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Bosnie-et-Herzégovine Transports