Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20190665
    Date de publication: 17 février 2020

    Promoteur – Intermédiaire Financier

    TELEKOM SLOVENIJE DD

    Lieu

    Description

    The project concerns the roll-out of a broadband fibre access network in Slovenia. The investments will lead to a significant increase in coverage with very high capacity networks. The project will enable a significant uplift of the broadband service offering to Gigabit speeds in the concerned areas.

    Objectifs

    The investments will lead to a significant increase in coverage with very high capacity and bring significant uplift of the broadband service offering to Gigabit speeds in the covered areas.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 100 million

    Coût total (montant approximatif)

    EUR 241 million

    Aspects environnementaux

    Investments in fixed telecommunications projects (mainly civil works for urban underground cable installations) do not fall under the Annexes of Directive 2014/52/EU amending the Environmental Impact Assessment (EIA) Directive 2011/92/EU. The related works have normally limited residual environmental effects as the trenching works are typically carried out alongside roads or consist of overhead cabling on existing poles. If required, any environmental impact about the project, including the CO2 footprint, will be assessed during the appraisal.

    Passation des marchés

    The Bank will require the Promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation, directive 2014/23/EU / 2014/25/EU, where applicable, as well as Directive 92/13/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 17/12/2020

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Slovénie Télécom