    Référence: 20180799
    Date de publication: 18 décembre 2018

    Promoteur – Intermédiaire Financier

    NORVENTO ENERXIA SL

    Lieu

    Description

    The project consists of the financing of four wind farms with sizes ranging from nine to 37 MW - for a total installed capacity of 100.35 MW (29 wind turbines), in the province of Lugo in the region of Galicia. The plants were awarded to the promoter during the second renewable energy auction that was held in Spain in May 2017.

    Objectifs

    The EIB financing for this operation is expected to have an important acceleration and demonstration effect. Indeed, it will be one of the first greenfield renewable energy projects to be financed in Spain after the moratorium in 2012 and the new regulatory framework - which came into effect in 2014. Besides, the present operation will contribute to the achievement of Spain 2020 targets for renewable energy and to the reduction of the CO2 emissions.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 40 million

    Coût total (montant approximatif)

    EUR 108 million

    Aspects environnementaux

    The project falls under the Annex II of the Environmental Impact Assessment (EIA) Directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU), and have been screened in by the competent authority, who confirmed that applicable EIA processes have been performed. The authorisation procedure has been completed for all wind farms and the relevant interconnection facilities.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation: Directive 2014/23/EU / 2014/24/EU or 2004/18/EC / 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC or Directive 89/665/EEC, as interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 14/12/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.