    The project consists of the construction and/or renovation of public education infrastructure including kindergartens, elementary (primary) schools, gymnasium (secondary) schools and vocational education schools in Montenegro. The project also includes provision of new Information and Communication Technologies (ICT) equipment as well as furniture for schools and specific equipment for vocational schools.

    Objectifs

    This project is part of an education strategy aimed at upgrading the physical and human capital of schools, with the objective to improve education attainments and learning outcomes.

    Secteur(s)

    Garantie au titre du MPE

    This operation is covered by the ELM Guarantee.

    Montant BEI envisagé (montant approximatif)

    EUR 29 million

    Coût total (montant approximatif)

    EUR 41 million

    Aspects environnementaux

    The project is expected to be located in locations where existing school and education infrastructure exists or be redeveloping existing brown-field sites that are no longer used. Therefore, potential negative environmental and social impacts are likely to be minor. If situated in the EU, the project would likely fall within Annex II of Directive 2011/92/EU as amended by 2014/52/EU - the Environmental Impact Assessment (EIA) Directive - and therefore be subject to screening. Current Montenegrin EIA legislation would screen the project components prior to providing development consent. The potential impact on any conservation areas will also need to be appraised. The compliance of the procedures in place with the EIB environmental and social standards will be analysed during the appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

    Statut

    Signé - 6/11/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Monténégro Éducation