Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20170773
Date de publication: 26 juin 2018

Promoteur – Intermédiaire Financier

PIRAEUS PORT AUTHORITY SA

Lieu

Description

The project concerns the expansion and upgrade of several areas of the port of Piraeus, Greece. The main project components include the expansion of the car terminal, the improvement of infrastructure of the ship repair zone, the development of a new port logistics centre, the construction of a new cruise passenger handling facility and the acquisition of new container terminal equipment. It also includes the renovation and upgrade of miscellaneous other port and electromechanical (E/M) equipment and installations to achieve the required service levels for the port operations.

Objectifs

The port of Piraeus is the main sea gateway of Greece and one of the largest in the Mediterranean, since its geographical position makes it a focal contact point between the islands and the mainland, as well as an international marine tourism and transit trade center. The project includes a number of components, some of which are part of a circa EUR 300m compulsory investment programme and others in addition to this that have been selected in order to upgrade the port's infrastructure and services.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 100 million

Coût total (montant approximatif)

EUR 281 million

Aspects environnementaux

Compliance with the SEA Directive 2001/42/EC, the environmental impact assessment (EIA) directive 2011/92/EC as amended by 2014/52/EU, the Habitats Directive 92/43/EEC, the Birds Directive 2009/147/EC, the Water Framework Directive 2000/60/EC (as amended), the Floods Directive 2007/60/EC, as well as biodiversity assessment requirements, climate change adaptation issues, mitigation/compensation measures and environmental and social monitoring plans, will be assessed in detail during appraisal.

Passation des marchés

Undisclosed information

Statut

Signé - 8/11/2019

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Grèce Transports