Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170511
    Date de publication: 25 septembre 2018

    Promoteur – Intermédiaire Financier

    REPUBLIC OF POLAND

    Lieu

    Description

    The project, involves the replacement construction, extension and rehabilitation of two Polish university hospitals in Gdansk and Lublin, both cohesion areas. The aim is to increase both the quality and the offer of healthcare services, enhance scientific excellence and improve medical professionals' education.

    Objectifs

    In Gdansk, EIB will finance the replacement construction of the Non-Invasive Medicine Centre, currently based in obsolete premises, which will be located nearby the Centre for Invasive Medicine, to facilitate operational synergy between the two university hospitals. The aim is to establish the first ever geriatric ward in the Pomeranian voivodship, a cardiovascular hub and provide state-of-the-art treatment in oncology and ophtalmology, including day hospital care. Moreover, the psychiatric wards will be relocated in the main building of the respective university hospitals, to avoid stigmatisation of patients. In Lublin, the extension and refurbishment of the University Hospital No 1 premises will mean the reconfiguration of the services, by introducing day hospital treatments. Furthermore, the hospital will increase its range of specialist healthcare, such as treatment of contagious diseases and allogenic transplantations at the Bone Marrow Transplantation Centre.

    Commentaires

    It is expected that the project will have positive social benefits as healthcare is an element of social cohesion.

    Secteur(s)

    • Santé - Santé humaine et action sociale

    Montant BEI envisagé (montant approximatif)

    PLN 390 million (EUR 91 million)

    Coût total (montant approximatif)

    PLN 784 million (EUR 183 million)

    Aspects environnementaux

    Hospitals are not specifically mentioned in the Environmental Impact Assessment (EIA) Directive 2014/52/EU (amending the Directive 2011/92/EU), however the project is covered by Annex II of the Directive in relation to urban development. EIB services will verify during appraisal the screening decision of the Competent Authority. The public buildings will be required to at least meet the energy efficiency targets as defined in: a) Directive 2010/31/EU on Energy Performance of Buildings; and (b) Directive 2012/27/EU on Energy Efficiency. The design energy performance of the hospital and any specific related targets to be met will be verified during appraisal.

    Passation des marchés

    EIB will require the Promoter to ensure that contracts for the implementation of the project shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/24/EU and/or 2014/25/EU and/or 2014/23/EU as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Signé - 28/02/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Pologne Santé