    Référence: 20170501
    Date de publication: 15 février 2018

    Promoteur – Intermédiaire Financier

    TERNA ENERGY INDUSTRIAL COMMERCIAL AND TECHNICAL SA

    Lieu

    Description

    The project involves the development, construction and operation of two separate onshore wind farms with a total operating capacity of 44.4MW, located in the Imathia and Kozani prefectures in northern Greece.

    Objectifs

    The development of wind energy supports EU and national targets for renewable energy generation and contributes to climate change mitigation.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    EUR 24 million

    Coût total (montant approximatif)

    EUR 61 million

    Aspects environnementaux

    Onshore wind farms fall under Annex II of the EU Environmental Impact Assessment (EIA) Directive 2011/92/EU (as amended by 2014/52/EU). It is, therefore, up to the member state's competent authority to judge whether a full EIA is required or not. The two sub-projects were screened according to Greek law and each wind farm underwent an individual EIA process, in which the corresponding ancillary works were included. The relevant environmental permits have been issued for both projects. One of the two wind farms adjoins a Natura 2000 designated site (site code: GR1210001, site name: Oros Vermio), while the second wind farm is located approximately 1.5km away from that site. The environmental procedure followed for the project, including a public consultation and the project's compliance with applicable EU Directives (EIA, Habitats and Birds Directives) shall be reviewed during the appraisal. If necessary, a Form A/B will be requested from the competent authorities.

    Passation des marchés

    The promoter has been assessed by the EIB as a private company not subject to EU rules on public procurement or concessions. However, if, after the project appraisal, the EIB were to conclude that the promoter is after all subject to EU public procurement legislation (i.e. Directive 2014/25/EU or 2004/17/EC, where applicable), then the Bank would require the promoter to ensure that contracts for the implementation of the project have been tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/25/EU or 2004/17/EC, where applicable, as well as Directive 92/13/EEC) as interpreted by the Court of Justice of the European Union, with the publication of tender notices in the Official Journal of the European Union, as and where required.

    Statut

    Signé - 12/07/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Grèce Énergie