    Référence: 20170479
    Date de publication: 29 août 2018

    Promoteur – Intermédiaire Financier

    SUND OG BAELT HOLDING A/S

    Lieu

    Description

    The project consists of the upgrading of the Danish railway access line, between Ringsted and Rodby, linking to the future Fehmarnbelt tunnel between Denmark and Germany.

    Objectifs

    The project concerns improving the railway line connection to the Fehmarnbelt tunnel on the Danish side. The upgrade includes the increase of line speed to 200 km/h for passenger trains, electrification of the track, constructing a double track for the whole section and equipping the track with European Rail Traffic Management System (ERTMS) Level 2 baseline 3. The project is located on the Scandinavian - Mediterranean Trans-European Transport Core Network (TEN-T) Corridor.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 677 million

    Aspects environnementaux

    The project consists of the modernisation and electrification of existing railway infrastructure and is to be carried out mainly within existing rights of way or on new alignment of twin track. The project falls under Annex I of the Environmental Impact Assessment (EIA) Directive 2011/92/EU and is a subject to an EIA.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been or shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2014/25/EC) interpreted by the Court of Justice of the EU, with the publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 5/03/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).