    Référence: 20170261
    Date de publication: 25 juillet 2017

    Promoteur – Intermédiaire Financier

    Metro de Madrid, S.A.

    Lieu

    Description

    The project concerns the investment programme for the rehabilitation, renewal and upgrade of the infrastructure of Madrid's metro network in Spain.

    Objectifs

    The project will benefit the residents of the city of Madrid and its suburbs. The project will improve the quality of the underground passenger transport service, reduce travel time, generate operating-cost savings, improve the travel experience and promote modal shift from road to rail. The project will therefore contribute towards sustainable transport in line with EU objectives for sustainable urban mobility and the reduction of greenhouse gas emissions.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 200 million

    Coût total (montant approximatif)

    EUR 402 million

    Aspects environnementaux

    The project is made up of a high number of sub-components. Due to the nature of the works – rehabilitation or upgrades of the metro lines, including stations – it is not expected to require an environmental impact assessment (EIA). However, the need for an EIA may vary between project components and will be analysed on a case-by-case basis, together with any potential significant impact on protected areas.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 15/06/2018

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).