Date de publication: 30 avril 2019
Promoteur – Intermédiaire Financier
JP VODOVOD I KANALIZACIJA-SKOPJELieu
Description
The project consists of the construction of a waste water treatment plant (WWTP) in Skopje, serving approximately 500 000 inhabitants.
Objectifs
As Skopje's wastewater is currently discharged in the Vardar river without any treatment, the project is expected to have major environmental and public health benefits. It will therefore have a substantial impact on the living conditions of the inhabitants of Skopje. In addition, the project will contribute positively to the gradual compliance of North Macedonia with all relevant environmental and water EU law and standards. As the Vardar river flows to the Hellenic Republic downstream (where its name is Axios) and reaches the sea west of Thessaloniki, the project is also expected to result in environmental benefits of a Member State.
Secteur(s)
- Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution
Garantie au titre du MPE
This operation is covered by the ELM Guarantee.
Montant BEI envisagé (montant approximatif)
EUR 148 million
Coût total (montant approximatif)
EUR 196 million
Aspects environnementaux
The project will generally benefit the environment and public health, either by providing better drinking water to the population, improving the efficiency of the treatment and distribution facilities, or by collecting and cleaning wastewater before discharging into receiving waters. As an EU candidate member state, the project will support North Macedonia's process for gradual compliance with EU standards and regulations on water, sanitation and the environment, and will provide the base for a possible accession agreement in the environmental chapter. Compliance with national Environmental Impact Assessment (EIA) legislation that has been drafted by transposing EU EIA Directive 85/337/EEC, amended by directives 97/11/EC and 2003/35/EC will be verified during the appraisal. With regards to regulations concerning the protection of habitats, respective EU Directives (92/43/EEC and 79/409/EEC) are considered to be transposed, subject to verification during the appraisal. North Macedonia is part of the international Emerald network, and procedures for compliance herewith will also be verified. The project will also help to meet national river quality objective (RQO) improvement targets set by the national Environmental Authority in line with the EU Water Framework Directive (2000/60/EC). A social assessment will also be undertaken as part of the appraisal.
Passation des marchés
The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.
Statut
Signé - 20/12/2019
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).