Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20170065
    Date de publication: 4 mai 2017

    Promoteur – Intermédiaire Financier

    RENEW SOLAR ENERGY (TELANGANA) PRIVATE LIMITED

    Lieu

    Description

    The project concerns the construction and operation of a solar photovoltaic (PV) plant with a capacity of 143 MWac in the Indian state of Telangana.

    Objectifs

    The project is in line with EU policy in the area of climate change, as it would contribute to the development of renewable energy, and the associated avoidance of greenhouse gas emissions. It will support the development of a sustainable and secure supply of energy that is necessary for India's long-term economic growth and development. It will also bring economic benefits to the region through the production of energy from renewable resources, the displacement of imported fuel costs, the expanded use of domestic resources and the reduction of greenhouse gas emissions and other airborne pollutants. It supports the EU-India Strategic Partnership, which promotes, inter alia, cooperation in curbing climate change. Similarly, this is in line with the Indian National Action Plan on climate change mitigation.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    USD 43 million (EUR 37 million)

    Coût total (montant approximatif)

    USD 155 million (EUR 132 million)

    Aspects environnementaux

    The project, if located in the EU, would fall under Annex II of the Environmental Impact Assessment (EIA) Directive, leaving the competent authority to decide as to whether or not an EIA is required. According to the applicable Indian law, PV plants do not require an EIA. Under the conditions of the related framework loan, the final beneficiary is required to carry out an environmental and social impact assessment (ESIA) study for the project. Details of the project's authorisation process, ESIA and implementation of the environmental and social management plan (ESMP) will be analysed during appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project is done in accordance with the Bank's Guide to Procurement.

    Statut

    Approuvé - 14/11/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Inde Énergie