Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160865
    Date de publication: 3 avril 2017

    Promoteur – Intermédiaire Financier

    The borrower is Nacional Financiera SNC (NAFIN), who will on-lend to an acceptable corporate.

    Lieu

    Description

    The project is an allocation under the Mexico Climate Action framework loan which will be intermediated by NAFIN (Nacional Financiera). The project concerns the construction of a 199.5 MW wind farm in Mexico. The wind farm comprises 95 wind turbine generators (WTGs), rated at 2.1 MW each, and associated infrastructure, including access roads, control centre and interconnection to the grid.

    Objectifs

    The project aims to help meet the Mexican national target of 35% of electricity generated from renewable energy sources by 2024. It is also consistent with the EIB's objectives outside the European Union, contributing to the promotion of renewable energy generation, and will contribute to the attainment of the UN Sustainable Development Goal (SDG) on climate action.

    Secteur(s)

    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné

    Montant BEI envisagé (montant approximatif)

    USD 40 million (EUR 34 million)

    Coût total (montant approximatif)

    USD 351 million (EUR 297 million)

    Aspects environnementaux

    If the plant was located within the EU it would fall under Annex II of the Environmental Impact Assessment (EIA) Directive (2011/92/EU), requiring the competent authorities to determine whether an EIA is required. Following Mexican national legislation a full EIA is mandatory for the project. Due to the specificities of the land tenancy in Mexico and the vulnerability of certain groups, the social impact will be carefully assessed at appraisal. Compliance with the EIB's environmental and social standards, with national law and EU environmental and social principles with particular reference to EU environmental horizontal directives, stakeholder engagement, access to information and impact on biodiversity and cumulative impact will also be verified at appraisal.

    Passation des marchés

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Statut

    Approuvé - 29/09/2017

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Mexique Énergie