    Référence: 20160166
    Date de publication: 4 octobre 2016

    Promoteur – Intermédiaire Financier

    AUTORITES LOCALES MULTIPLES

    Lieu

    Description

    Programme loan financing multiple energy efficiency investments in the municipal sector in Romania

    Objectifs

    The proposed programme loan would finance energy efficiency investments undertaken by various Romanian municipalities and other acceptable sub-sovereign public authorities (SSPAs). At this stage, the proposed programme loan targets around 10 SSPAs.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 208 million

    Coût total (montant approximatif)

    EUR 360 million

    Aspects environnementaux

    This programme will consist of projects that intend to bring environmental benefits by supporting measures that reduce energy consumption, and help to mitigate climate change. The sub-projects to be financed under the different allocations are small and are expected to have a very limited negative environmental impact. Given the scale, location and nature of the sub-projects an environmental impact assessment (EIA), as defined under the EIA Directive 2011/92/EU, is normally not required. The subprojects consisting of thermal building refurbishments of buildings will comply with the Energy Performance of Buildings Directive 2010/31/EU requirements.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Approuvé - 13/12/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.