    Référence: 20160952
    Date de publication: 9 octobre 2017

    Promoteur – Intermédiaire Financier

    MUNICIPIUL BUCURESTI - SECTORUL 6

    Lieu

    Description

    This investment concerns the thermal retrofit of existing and the construction of new public schools and kindergartens as well as the thermal rehabilitation of multi-family residential buildings in the municipality of Sector 6 in Bucharest. The project will focus on thermal energy efficiency measures of the building envelope and internal equipment, including the installation of solar panels for electricity and hot water.

    Objectifs

    This operation will bring environmental benefits by supporting projects that reduce energy consumption and thus help to reduce air pollution and mitigate climate change.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 38 million

    Coût total (montant approximatif)

    EUR 58 million

    Aspects environnementaux

    The sub-projects to be financed are small residential and public buildings within the urban area of the municipality of Sector 6 and are expected to have very limited negative environmental impact. Given the scale, location and nature of the sub-projects, an environmental impact assessment (EIA), as defined under the EIA Directive 2014/52/EU, amending the EIA Directive 2011/92/EU, is normally not required. The sub-projects consisting of thermal refurbishments of buildings and construction of new buildings as near Zero Energy Buildings (NZEB) will comply with the requirements of the Energy Performance of Buildings Directive 2010/31/EU. For all buildings under the operation, energy performance certificates will be required.

    Passation des marchés

    The promoter is a public entity and therefore public procurement rules will apply. The Bank will require the promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation (Directive 2014/24/EU and Directive 2007/66/EC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the European Union, as and where required.

    Statut

    Signé - 18/12/2019

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Aménagement urbain Industrie