Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20160764
    Date de publication: 14 octobre 2016

    Promoteur – Intermédiaire Financier

    MUNICIPIUL BUCURESTI - SECTORUL 6

    Lieu

    Description

    Financing energy efficiency refurbishments of 112 multi-apartment buildings in Bucharest Sector 6

    Objectifs

    This investment concerns the second phase of the refurbishment programme of multi-family housing in the municipality of Sector 6 in Bucharest. The project will focus on thermal energy efficiency improvements of the building envelope (wall insulation, windows, roofs and cellar insulation) as well as optimisation of the heating systems.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 37 million

    Coût total (montant approximatif)

    EUR 54 million

    Aspects environnementaux

    This programme will consist of projects that intend to bring environmental benefits by supporting measures which reduce energy consumption, and help to mitigate climate change. The sub-projects to be financed under the different allocations are small and are expected to have a very limited negative environmental impact. Given the scale, location and nature of the sub-projects an environmental impact assessment (EIA), as defined under the EIA Directive 2011/92/EU, is normally not required. The sub-projects consisting of thermal building refurbishments of buildings will comply with the requirements of the Energy Performance of Buildings Directive 2010/31/EU.

    Passation des marchés

    The Bank will require the promoter to ensure that contracts for the implementation of the project have been/ shall be tendered in accordance with the relevant applicable EU procurement legislation (Directives 2004/18/EC and/or 2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

    Statut

    Signé - 20/12/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Services