Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20200254
    Date de publication: 19 octobre 2020

    Promoteur – Intermédiaire Financier

    MUNICIPIUL BUCURESTI - SECTORUL 6

    Lieu

    Description

    Financing of the fourth phase of the Bucharest S6 thermal rehabilitation programme to improve the energy efficiency of 277 individual buildings (corresponding to 85 homeowner associations) located in Sector 6 of Bucharest Municipality. This project falls under the Smart Finance for Smart Buildings (SFSB) Initiative, a joint initiative of the EIB Group and the European Commission (EC) aimed at supporting energy efficiency investments in buildings.

    Objectifs

    The project will improve the energy efficiency of 85 homeowners associations located in Bucharest Sector 6. The project targets 277 buildings and will focus on thermal energy efficiency improvements of the building envelope (wall, roofs and cellar insulation), window replacement, improvements in the heating and domestic hot water systems and replacement of indoor lighting located in common spaces.

    Secteur(s)

    Montant BEI envisagé (montant approximatif)

    EUR 20 million

    Coût total (montant approximatif)

    EUR 95 million

    Aspects environnementaux

    This operation is expected to produce environmental benefits by supporting measures which reduce energy consumption and help mitigate climate change. The buildings to be rehabilitated are expected to have limited negative environmental impact during construction. Given the scale, location and nature of the sub-projects, an environmental impact assessment (EIA), as defined under the EIA Directive 2014/52/EU amending the 2011/92/EU, is normally not required. The operation will comply with the requirements of the Energy Performance of Buildings Directive 2010/31/EU.

    Passation des marchés

    The Promoter is a public entity and therefore public procurement rules will apply. The Bank will require the Promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable national and EU procurement legislation (Directive 2014/24/EU and Directive 2007/66/EC), which may include publication in the Official Journal of the EU where appropriate.

    Statut

    Signé - 13/04/2021

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Aménagement urbain