Recherche Fr menu Portail client du Groupe BEI
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
Référence: 20160038
Date de publication: 7 septembre 2016

Promoteur – Intermédiaire Financier

undisclosed

Lieu

Description

Investments in energy-efficient modernisation of residential housing and the construction of near-zero energy buildings (NZEB)

Objectifs

This operation supports regional, national and European objectives related to improving energy efficiency and increasing renewable energy generation in the housing sector.

Secteur(s)

Montant BEI envisagé (montant approximatif)

EUR 100 million

Coût total (montant approximatif)

EUR 230 million

Aspects environnementaux

This operation intends to bring environmental benefits by supporting schemes that reduce energy consumption, increase the use of renewable energies and thus help to mitigate climate change. The individual schemes to be financed are likely to be small and are expected to have a very limited negative environmental impact. The cumulated impact of sub-projects could instead generate important environmental benefits. Given the scale, location and nature of the individual schemes in built-up urban areas, an environmental impact assessment (EIA), as defined in the EIA Directive 2011/92/EU, is not required. The Bank will assess the promoter's capacity and procedures to ensure compliance with national and European environmental and biodiversity regulations as well as its capacity to support the Bank's public disclosure policy, which aims to facilitate access by the public to environmentally relevant information.

Passation des marchés

The promoter has been assessed by the Bank as being a private company not operating in the utilities sector and not having the status of a contracting entity, thus not subject to EU rules on public procurement. The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the EIB Guide to Procurement or, if applicable, relevant applicable EU procurement legislation (Directive 2004/18/EC, or 2014/24/EU where applicable, and/or 2004/17/EC, or 2014/25/EU where applicable, and/or 2014/23/EU where applicable, as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the Official Journal of the EU, as and where required.

Statut

Signé - 16/12/2016

Clause de non-responsabilité

Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

Mots-clés correspondants

Allemagne Aménagement urbain Énergie Services Industrie