Recherche Fr menu fr ClientConnect
Recherche
Résultats
5 premiers résultats de la recherche Voir tous les résultats Recherche avancée
Recherches les plus fréquentes
Pages les plus visitées
    Référence: 20150325
    Date de publication: 24 juin 2015

    Promoteur – Intermédiaire Financier

    ROMANIA

    Lieu

    Description

    The project concerns drinking water treatment and distribution, as well as wastewater collection and treatment, located in Neamt and Harghita county in Romania.

    Objectifs

    The projects fall under the Romanian National Strategic Reference Framework (NSRF), priority Axis 1 of the Sectorial Operational Programmes (SOP) for Environment for the 2007-2013 programming period. This programme is financed by the Structural Programme Loan NSRF Cofinancing Facility. The purpose of the project is to achieve compliance with EU drinking water and urban wastewater directives as well as to promote greater sustainability in water services and resource management.

    Secteur(s)

    • Eau, assainissement - Production et distribution d'eau; assainissement, gestion des déchets et dépollution

    Montant BEI envisagé (montant approximatif)

    EUR 16 million

    Coût total (montant approximatif)

    EUR 120 million

    Aspects environnementaux

    All projects comprising rehabilitation and development of networks in smaller agglomerations fall under Annex II of the Environmental Impact Assessment (EIA) Directive and were screened out by the competent authority. The results of the EIA process were reviewed by DG Environment.

    Passation des marchés

    The promoter, Regional Operating Company, responsible for public procurement, is subject to EU public procurement regulations (Directive 2004/17/EC for utilities). The Bank will require the promoter to ensure that contracts for the implementation of the project have been/shall be tendered in accordance with the relevant applicable EU procurement legislation (2004/17/EC as well as Directives 89/665/EEC and 92/13/EEC) as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required.

    Statut

    Approuvé - 26/02/2016

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Mots-clés correspondants

    Roumanie Eau, assainissement